Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />then compared 10 the available baseline data presented in the Intensity Duration <br />Frequency (lDn curves generated using NOAA Atlas 2 in order to make a frequency <br />estimation for this data. The rcsuhs of this analysis arc summari/cd belov. in Table 1.1. <br /> <br />I <br /> <br />Table 1.1 - Peak Rainfall Frequency Analysis Summary <br /> <br />I <br /> <br /> Ulneline Point Rainfall Amounl\ for the Cit).- o(Woodllnd "ad.. <br /> Duration Rainfalllnlcnsit~ Total Precipitation <br />Soorce (hours) (inches'hour) (inches) h..::nl Frequenc~ <br />;-";OA..\ Alia" ~ , 0..16 O.~ 2-Year <br />'OAAAllas2 J 0.3-1 1.0] 2-Year <br />'OA.-\ Alias .2 6 0.1<) 1.15 2-Year <br /> I'ea!. Rainfall Amounts As N.elDrted t" Weather I ndererouod. <br /> Duration Peak Rainlalllnlt'nsit} Total Precipitation <br />Stormlhtle (hours) (inches.-houn (incho:-s) F~1. hent Frequenc) <br />Jut} [6,2004 2 0.16 0.71 l.t'.\s Ihlt" 2-Year <br />July 22.2.l2{J()..4 , O.J-t LJ~")\OW:-';.. l.ess Ihan 2.\'~ar <br />July 28. 2tlO4 5.5 O."~ 0.51 l.e~\ than 2.\'~ar <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />. ~ Peal.. Inl.:<nslllCs and Tolal Rainfall AmOlMllS Ubtalned Irum Wcalh<:r U"~rgrollrHJ f..r v. l."alh<:r ""all,," J.\,('Ov. OODL::! In WlI\l.!lal <br />.. ~ l.:nahle lu [)clermmc TOlllI [)all~ Rainfall Am"lSll 3-' Peak S1"nn ~anned 'o:>eral l)a~, <br /> <br />I <br /> <br />I <br /> <br />Estimated Flood Dama!!es & Special Factors Affectio!! the Flood <br /> <br />I <br /> <br />A Slate of disaster and emergency declaration \\'as issued by the T dler County Board of <br />Commissioners on Saturday. July 17. Due to continued heavy rains the following week. <br />the emergency status was extended. The declarution pemlits the county access to <br />approximately $500.000 in contingency funds to repair damages caused by the flooding. <br />However. r.:ount~ oflkials including memhers of the Division of L.ocal Affairs and the <br />Teller Count~ DUI arc estimating repairs and mitigation costs to date will more than <br />Lriple that amount. <br /> <br />I <br /> <br />I <br /> <br />Teller County Administrator. Greg \\'inklcr. told a reporter for the Ute Pass Courier at a <br />press conference. "In my 15 years here I've not sl,;'en this much damage:' Jean Garren. <br />Senior Planner for Teller County listed estimated countywide damages in the <br />neighhorhood of $1.6 million. Of that ligure. repair costs in the Turkey Rock <br />Subdivision alone including the dams and roadways along Turkey Creek Dri\.e. Ruby <br />Drj\.e at Lake Taylor. Dennis Orin:. and Appleby Drhe. total SI.I 3..t.000. o\"~r 70% of <br />the toral ~stimated cost of repairs. Because many of the dams and the dri\"e\'...ays in the <br />Turk.e~ Rock Subdi\ision were not constructed by Teller County. the county is not <br />\\il1ing to pay for the reconstruction of non-county dams and driveways that were <br />damaged by the July flooding. The County believes the homeo\\ners of the subdi\'ision <br />should re-build thl,;' dams used for landscaping in the neighborhood. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />ICON Engll'"'l{:enng. (nc <br /> <br />7 <br /> <br />February cOOS <br /> <br />I <br />