Laserfiche WebLink
<br />TABLE 1 <br />CRSP TRANSMISSION SYSTEM COST ANO CAPACITY COM~ITMENTS <br /> <br />FY 1986 <br /> <br />fTEM <br /> <br />TRANS. INVESTMENT - 2.875% <br />TRANS. INVESTMENT - 5.682% <br />TRANS. INVESTMENT - 6.063% <br />TRANS. INVESTMENT - 9.352% <br />TRANS. INVESTMENT -10.051% <br />TRANS. INVESTMENT -10.403% <br />TRANS. INVESTMENT -10.898% <br />TOTAL <br />ANNUAL COSTS <br />AMORTIZATION - 2.875%% <br />AMORTIZATION - 5.682% <br />AMORTIZATION - 6.063% <br />AMORTIZATION - 9.352% <br />AMORTIZATION -10.051% <br />AMORTIZATION -10.403% <br />AMORTIZATION -10.898% <br />OPERATION & MAINT EXP <br />REPLACEMENTS 1/ <br />WHEELING COST! <br />SUBTOTAL <br />ANNUAL REVENUES <br />SUBSTATION RENTAL <br />EXCHANGE CAP. CHARGES 2/ <br />SUBTOTAL - <br />NEr ANNUAL TRANS. COSTS <br />CAPACITY COMMITMENTS (MW) <br />CAP. OF CRSP POWERPLANTS <br />FIRM WHEELING.SRP <br />FIRM WHEELING.NTUA <br />FIRM WHEELING.ICPA <br />FIRM WHEELING-OCRR <br />FIRM WHEELING-OTHER 3/ <br />NONFIRM WHEELING 4/ - <br />LESS POWERPLANT RESERVES <br />TOrAL <br /> <br />UNIT COST (~/KW-YR = <br /> <br />1986-88 AVERAGE: 15.94 kW Yr <br /> <br />NON-FIRM RATE <br />8760 kWh x .582 = 5098 kWh <br />115.94; 5098 = 3.1 mill/kWh <br /> <br />~213,354,337 <br />o <br />o <br />39,687,959 <br />7,347,744 <br />o <br />o <br />~260,390,040 <br /> <br />~ 7,977,594 <br />o <br />o <br />3,699,504 <br />733,793 <br />o <br />o <br />7,636,894 <br />2,461,061 <br />2,296,307 <br />~ 24,576,636 <br /> <br />~ 330,000 <br />1,050,000 <br />1,380,000 <br /> <br />23,425,154 <br /> <br />1,648 <br />33 <br />23 <br />15 <br />o <br />o <br />71 <br />-68 <br /> <br />1,122 <br /> <br />13.60 <br /> <br /> FY 1987 FY 1988 <br />$213,354,337 $214,421,951 <br /> 0 423,209 <br /> 0 10,629,998 <br /> 111,195,577 111,195,577 <br /> 9,112,829 10,335,017 <br /> 0 0 <br /> 0 10,534,866 <br />~344,662,743 1357,540,618 <br />$ 7,977,594 $ 8,017,513 <br /> 0 25,289 <br /> 0 670,368 <br /> 10,365,071 10,365,071 <br /> 910,066 1,032,122 <br /> 0 0 <br /> 0 1,137,698 <br /> 8,164,160 8,691,427 <br /> 2,461,061 2,461,061 <br /> 2,358,833 2,421,361 <br />$ 31,945,741 $ 34,468,339 <br />$ 330,000 $ 330,oaO <br /> 1,050,000 1,050,000 <br /> 1,380,000 1,380,000 <br /> 30,856,785 33,441,911 <br /> 1,678 1.702 <br /> 33 33 <br /> 23 23 <br /> 15 15 <br /> 0 0 <br /> 50 50 <br /> 136 136 <br /> -68 -68 <br /> 1,867 1,891 <br /> 16.53 17.68 <br /> <br />11 Average annual replacements of CRSP transmission investments for FY <br />1986-2085. <br />2/ $1.75 times 600,000 kW of exchange capacity. <br />11 Assume that a minimum of 50 MW will be available for firm wheeling <br />commitments after completion of the Western Colorado Transmission system. <br />Currently Western has received requests for much more than 50 MW. <br />if The average amount of nonfirm transmission for the period 1979-1984 was <br />used as an estimate of future nonfirm wheeling transactions. After <br />completion of the Western Colorado Transmission System an amount equal to <br />the peak historical year's nonfirm wheeling waS used to estimate future <br />requests. <br /> <br />SRP = Salt River Project <br />NTUA = Navajo Tribal Utility Authority <br />rCPA = Intermountain Consumers Power Association <br />OCRR = State of Nevada Division or Colorado River Resources <br /> <br />7 <br />