Laserfiche WebLink
<br />'- <br /> <br />'>~ <br /> <br /> <br />TOWN of FRISCO <br />P.O. BOX 370 <br />SUMMIT COUNTY <br />FRISCO, COLORADO 80443 <br /> <br />November 8, 1991 <br /> <br />Mr, William R. Locke <br />Chief, Risk Studies Division <br />Federal Insurance Administration <br />Office of Risk Assessment <br />500 C Street SW, Room 422 <br />Washington, DC 20472 <br /> <br />RE: Ten Mile Creek <br />Case No,: 90-08-12R <br />Community: Town of Frisco, Colorado <br /> <br />Dear Mr. Locke: <br /> <br />With this letter and attachments, the Town of Frisco is requesting a final <br />Letter of Map Revision (LOMR) for a portion of Ten Mile Creek. <br /> <br />This project was submitted as a Conditional LOMR. The initial request was <br />submitted by Ms, Peggy A. McCarthy of Greenhorne & O'Mara, Inc., on behalf of <br />the Town, on April 12, 1990. Final approval was received from you in a letter <br />dated May 2, 1991, <br /> <br />In your May 2, 1991 letter (copy attached) you requested two items for final <br />determination of the LOMR: <br /> <br />A. "As-built" plans certified by a registered professional engineer of all <br />proposed project elements. <br /> <br />B. Evidence of adoption of the floodplain management ordinances incorporating <br />the increased BFE's and revised floodways for the post-project condition. <br /> <br />For preparation of the "as-built" plans (record drawing), Greenhorne & 0 'Mara <br />performed field surveys to locate the proposed project elements horizontally <br />and vertically. There are only minor changes between the plans and field <br />locations, which are primarily in the structures actual station location and <br />slight modifications in finished elevation. The changes are incorporated into <br />the final HEC-2's, profiles and drawings. To assist you in your review of our <br />LOMR, we have included two copies of the plans and profiles with one copy each <br />showing those areas that differ from the CLOMR in yellow highlight. <br /> <br />We have also enclosed revised HEC-2's (floodway and multiple runs) which <br />include all as-built information. Note that the as-builts only affected <br />Section 32+26 through 40+23. <br /> <br />668-5276 <br /> <br />FAX 668-0677 <br /> <br />Denver Direct 893-1855 <br />