My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03543
CWCB
>
Floodplain Documents
>
Backfile
>
3001-4000
>
FLOOD03543
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:27:35 PM
Creation date
10/4/2006 11:50:36 PM
Metadata
Fields
Template:
Floodplain Documents
County
Arapahoe
Stream Name
South Platte
Basin
South Platte
Title
Union Avenue Boat Drop
Date
1/1/1983
Prepared For
CWCB
Prepared By
CWCB
Floodplain - Doc Type
Easement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />I <br />I <br />-I <br />I <br />,I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />8 <br /> <br />Flow will be channelized at 20 cfs and the rocks will be submerged at 100 cfs. <br /> <br />The gaging station Is not a part of the proposed project but it must not conflict with <br />the project. There will be a takeout for boaters on the left bank. The line of rOCKS <br />should not create II 'keeper' problem downstrellm of them. They should 1I1so not <br />cause an increase In depths during higher flows. A 404 permit will probably be <br />required. Ben Urbonas of the UD8.FCD and Greg Moore of the USACE requested that <br />drawings of the proposed Installation be sent to them so that they could review them <br />prior to the construction of the gaging station. <br /> <br />The general timing of the project was discussed. Jim Curnes wanted to know when <br />he could expect construction to stert. Ron Rossmiller Sllld that WWE envisioned a 7 <br />month process: 2 for design, I for reviews, 1 for the letting process, IInd 3 for <br />construction. Ben Urbonas felt that the construction period could be as much as 6 <br />months because of rOCK delivery needs. Quarrying operations might be the critical <br />path constraint. This is a matter which WWE would investigate in final design. <br /> <br />Cliff Pugh said that the USBR modeling would be completed by the end of April. If <br />design begins on May I, then construction could begin in September or October. <br />Even with a 6 months construction period, this would still have construction com- <br />pleted before the 1990 runoff sellson. However, there is no time for delays. <br /> <br />Cliff Pugh distributed copies of work done to date by the USBR and work still to be <br />completed (copy attached). Ken Wright said he and local, state, and federal gov- <br />ernment officials wanted to thank the USBR for the highly professional and great <br />work they hlld done on the model. The rest of the group echoed his thllnKs. <br /> <br />Greg Moore indicated that a 404 permit will be required with publiC notice for the <br />project. He will need a general drllwing of the boat chute configurlltions on 81/2- <br />by II-Inch paper along with total quantities. The process could be started now. <br /> <br />The meeting adjourned about 11 :30 a. m. <br />
The URL can be used to link to this page
Your browser does not support the video tag.