Laserfiche WebLink
<br />PROPOSAL SCIIBDULB <br /> <br />ITEM 3. <br /> <br />TOPSOIL <br /> <br />.1 SUMMARY SHBBT <br /> <br />DESCRIPTION <br /> <br />DIRECf UNIT COST <br /> <br />TopsoD <br />BuDd I Maintain Haul Roads <br /> <br />Q1Y <br /> <br />40550.00 CY <br />40550.00 CY <br /> <br />UOM <br /> <br />20,919.98 <br />1,000.00 <br /> <br />4.60 <br />0.22 <br /> <br />TOTAL ITEM 3 <br /> <br />21,919.98 <br />