Laserfiche WebLink
<br />PROPOSAL SCIIBDULB <br /> <br />ITEM 2. <br /> <br />COMPACTBD BMBANKMBNT.. <br /> <br />I SUMMARY SUBBT <br /> <br />DESCRIPTION <br /> <br />Q1Y <br /> <br />UOM <br /> <br />DIRECf UNIT COST <br /> <br />Compacted Enbankmenl <br />- Water Control A <br />- Water Control B <br />- Pump Facility <br /> <br />5,200.00 CY <br />2,960.00 CY <br />4,240.00 CY <br />.......... CY <br /> <br />TOTAL ITaM 2 <br /> <br />24,889.86 <br />10,139.55 <br />12,259_'\8 <br />1,800.00 <br /> <br />49.088.79 <br /> <br />4.79 <br />3.43 <br />2.89 <br />0.15 <br />