<br />smUCIURAL STHEL <br /> Qty. Unit Material Labor Fabrication Material Labor Fabrication TOTAL <br /> Unit Unit Unit Total Total Total <br />Water Control Structure "D" <br />Ora ting 52.00 Sf 0.00 1.25 0.00 0.00 65.00 0.00 65.00 <br />Grating Frame L 4 x 3 x 3 60.00 Lf 0.00 4.75 0.00 0.00 285.00 0.00 285.00 <br />Grating Frame 1 x 318 Ba 60.00 Lf 0.00 2.75 0.00 0.00 165.00 0.00 16S.00 <br />Handrail 11{2" Extra Strong <br />Posts 100.00 Lf 0.00 15.00 0.00 0.00 I,sOO.OO 0.00 I,sOO.OO <br />Dase Plates lO.OO Each 0.00 15.00 0.00 0.00 150.00 0.00 150.00 <br />Side Mounted Plates lO.OO Each 0.00 25.00 0.00 0.00 250.00 0.00 250.00 <br />1{2" Bolts 120.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br />Rails 224.00 Lf , 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br />Armour Angle L 3 x 3 x 5 28.00 Lf 0.00 15.00 0.00 0.00 420.00 0.00 420.00 <br />Studs 20.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br />Galvainize 750.00 Lb 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br />Equipment Rental 1.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br />Stop Log Frame 1.00 Each 8,929.00 2,sOO.OO 250.00 8,929.00 2,sOO.OO 250.00 lI,67\l.OO <br />Stop Log 10.00 VIf 30.00 52.50 0.00 300.00 525.00 825.00 <br />Lifting Beams 1.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 <br />Galv. Steel from Puritan 5,825.00 0.00 0.00 5.825.00 <br />TOTAL 14,754.00 5,635.00 775.00 21,16-4.00 <br />