Laserfiche WebLink
<br />STRUCI'URAL STEEL - CoatiDaed <br /> Qty. Unit Material Labor Equipment Material Labor Equipment TOTAL <br /> Unit Unit Unit Total Total Total <br />Water Control Structure eA. <br />Gra ting 52.00 Sf 0.00 1.25 0.00 0.00 65.00 0.00 65.00 <br />Grating Frame L 4 X 3 X 3 6O.00Lf 0.00 4.75 0.00 0.00 285.00 0.00 285.00 <br />Grating Frame 1 X 318 Ba 6O.00Lf 0.00 2.75 0.00 0.00 165.00 0.00 165.00 <br />Handrail 1 1{2. Extra Strong <br />Posls 8O.00Lf 0.00 15.00 0.00 0.00 1,200.00 0.00 1,200.00 <br />Base Plates 6.00 Each 0.00 15.00 0.00 0.00 90.00 0.00 90.00 <br />Side Mounted Plates 10.00 Each 0.00 15.00 0.00 0.00 150.00 0.00 150.00 <br />1{2" Bolts 64.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br />Rails 152.00 Lf 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br />Armour Angle L 3 X 3 X 5 20.00 Lf 0.00 15.00 0.00 0.00 300.00 0.00 300.00 <br />Studs 16.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br />Galvainize 750.00 Lb 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br />Equipment Rental 1.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br />Stop Log Frame 1.00 Each 6,884.00 2,500.00 200.00 6,884.00 2,500.00 200.00 9,584.00 <br />Stop Log 10.00 V1f 30.00 52.S0 0.00 300.00 525.00 825.00 <br />Lifting Beams 1.00 Each 0.00 0.00 0.00 0.00 0.00 0.00 <br />Galv. Steel from Puritan 4,913.00 0.00 0.00 4,913.00 <br />lOTAL WATER CONTROL .A. 11.797.00 5.155.00 715.00 17.677.00 <br />