My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03503
CWCB
>
Floodplain Documents
>
Backfile
>
3001-4000
>
FLOOD03503
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:27:29 PM
Creation date
10/4/2006 11:49:04 PM
Metadata
Fields
Template:
Floodplain Documents
County
Jefferson
Community
Golden
Stream Name
Tucker Gulch, Kenneys Run
Basin
South Platte
Title
Major Drainageway Planning
Date
9/1/1983
Prepared For
Golden, Jefferson County
Prepared By
UDFCD
Contract/PO #
&&
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />COMMENTARY - SHEET 4 of 12 <br /> <br />COST ESTIMATE - SHEET 4 OF 12 <br /> <br />As discussed in the commentaries for the previous 2 sheets, grade stabiliza- <br />tion structures are included as a general recommendation. <br /> <br />ITEM <br /> <br />Recommended length and elevation requirements are provided on the plan for a <br />pedestri an bri dge bei ng proposed by the City of Golden. For the City-owned <br />property downstream of Fi rst Street, the recommend at ion is to uti 1 i ze the <br />planned trail system for maintenance access to the existing rock-lined channel <br />and obtain any easements needed to assure access rights. <br /> <br />Channel Improvements <br />Street Crossings <br />Utility Relocation <br /> <br />Subtota 1 <br />Contingencies (15%) <br />Engineering, Legal & Administrative (15%) <br /> <br />The exi st i ng rock-l i ned channel appears to be in good condi t ion. Peri odi c <br />pl acement of rock wi 11 be requi red as part of a regul ar mai ntenance program. <br />The recommendation for the existing rock-lined channel is to maintain the <br />existing condition. No improvement costs to the existing channel are included <br />in the following cost estimate other than the costs associated with construc- <br />ting the grade stabilization structures. Selective rock placement is included <br />in the annual O&M cost figure. <br /> <br />TOTAL CONSTRUCTION COST <br /> <br />Right-of-Way Acquisition <br /> <br />TOTAL CAPITOL COST OF IMPROVEMENTS <br /> <br />The recommended plan for this reach is floodplain regulation. <br /> <br />TOTALS IN EACH JURISDICTION <br /> <br />City of Golden <br />Jefferson County <br /> <br />Annual Operation and Maintenance Costs <br /> <br />COST <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />$ 52,000 <br />-0- <br />-0- <br /> <br />52,000 <br />7,800 <br />7.800 <br /> <br />67,600 <br /> <br />-0- <br /> <br />67,600 <br /> <br />67,600 <br />-0- <br /> <br />(4,700) <br />
The URL can be used to link to this page
Your browser does not support the video tag.