My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03463
CWCB
>
Floodplain Documents
>
Backfile
>
3001-4000
>
FLOOD03463
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2010 10:15:22 AM
Creation date
10/4/2006 11:47:02 PM
Metadata
Fields
Template:
Floodplain Documents
Designation Number
72
County
Adams
Arapahoe
Douglas
Community
Denver Metro Region
Stream Name
Van Bibber Creek
Basin
South Platte
Title
Major Drainageway Planning - Van Bibber Creek
Date
3/1/1977
Designation Date
7/1/1977
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />. <br />I <br />I <br /> <br />-8- <br /> <br />quality, sacrificing aesthetic values and the effect on social, <br />political, and personal well being. <br /> <br />The benefit of undertaking flood control related improvements <br />along Van Bibber Creek, would be the reduction in the damage <br />potential due to future flooding. Undertaking certain improve- <br />ments which would reduce or eliminate the damage potential for <br />certain areas along the Creek would provide the benefit of <br />reducing the damage potential associated with that portion of <br />the Creek. By designing improvements to relieve the potential <br />flood damage for certain frequencies of flooding, the average <br />annual benefit to the community and property owners can be <br />determined by taking the difference between the average annual <br />damage potential before and after improvements. The benefit- <br />cost ratio is then determined by comparing the present worth <br />of the benefit for reduced annual flood damage potential, to <br />the cost of the project. The optimum project would tend to <br />maximize the benefit-cost ratio. <br /> <br />For the purposes of assessing damage to personal property, <br />depth-damage curves were utilized which relate the percent <br />of damage to a house by the depth of water inundating the house. <br />The curves used in this study were developed by the Federal <br />Insurance Administration. For the purposes of the Van Bibber <br />Creek study, a typical house type was considered to be a small <br />ranch with approximately 1,000 square feet of living space and <br />no basement. The house was considered to have a market value <br />of $27,000 and a lot value of $3,000. The contents of the house <br />were set at $8,000. For the purposes of assessing indirect <br />damages, the study followed the recommendations of the Soil <br />Conservation Service in their publication, "Economics Guide <br />for Watershed Protection and Flood Protection (Ref. 2). This <br />publication recommends that indirect damages be assessed as a <br />percentage of direct damages, as follows: <br /> <br />Residential area: 10-15% <br />Commercial & Industrial: 15-20% <br />utility: 15-20% <br /> <br />A more detailed summary of the damage-benefit potential analysis <br />is provided in the Phase A Report. Also included in that report <br />is a tabulation of the average annual damage associated with <br />various reaches along Van Bibber Creek, as well as the present <br />worth of the potential damage. Charts are also provided which <br />show the accumulated flood damage and accumulated benefits of <br />improvements within the creek. The overall benefit-cost ratio <br />of the improvements recommended in the Phase A report was 1.5. <br /> <br />The present worth of damage along Van Bibber Creek was estimated <br />to be approximately $18 million. Of this total, approximately <br />$12 million represents the present worth of flood damage within <br />the City of Arvada and $6 million within unincorporated Jefferson <br />County. The present worth of flood damage represents today's <br />value of the flood damage which will occur along Van Bibber Creek, <br />with present day channel conditions through the upcoming 100-year <br />period. The present worth is equivalent to the average annual <br />flood damage potential for Van Bibber Creek, approximately $1.5 <br />million per year, based on a 50-year investment at an 8% <br />interest rate. <br /> <br />Legal Evaluation <br /> <br />A requirement of the Phase A planning was the completion of a <br />special legal evaluation of the proposed flood control alterna- <br />tives. The intent of the legal review was to outline possible <br />liabilities which may be associated with each alternative. <br /> <br />To accomplish this evaluation, the firm of Moses, Wittemyer <br />and Harrison, p. C. was retained and consulted. The attorney <br />became familiar with the problems associated with Van Bibber <br />
The URL can be used to link to this page
Your browser does not support the video tag.