Laserfiche WebLink
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />I. <br />.. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />'. <br />. <br />. <br />. <br />I. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />I. <br />. <br />. <br />. <br /> <br />MEETING AND FIELD RECONNAISSANCE REPORT <br /> <br />Project: CWCB Floodplain Designation Project <br /> <br />Site: San Miguel County <br />Town of Telluride <br /> <br />Date of Visit: November 9,2000 <br /> <br />Date of Report: November 13, 2000 <br /> <br />Personnel Present: Jerry Gibbens, Montgomery Watson <br />Tom Browning, CWCB <br /> <br />Prepared By: Jerry Gibbens, Montgomery Watson <br /> <br />Notes: <br /> <br />The purpose of the meetings and field investigation was to meet with the county and <br />incorporated areas, observe general basin and channel characteristics, and to investigate specific <br />issues that arose during the meeting and during the FlS and FIRM review, The following <br />summarizes the field review, Selected photographs have also been included, <br /> <br />Meeting with the county <br />. A meeting was held with Karen Henderson and Dave Schneck, San Miguel County planning, <br />at 9:00 am, A meeting was held with Bill Frownfelter, Town of Telluride, at 10:30 am, Both <br />meetings took place in their respective offices and a field trip was made to the San Miguel <br />River restoration project with Mr, Frownfelter, <br /> <br />. During both meetings, Tom Browning made introductions, explained the purpose of the <br />meeting, reviewed legislation supporting the designation process and described the <br />designation process, <br /> <br />. The County requested that additional streams be studied, These streams include: <br /> <br />. Howard's Fork near Ophir <br />. Leopard Creek <br />. Big Bear Creek <br />. Lower Naturita Creek <br /> <br />Tom indicted that he would add these to the State's request list. <br /> <br />. In 1999, there were mudslides along the Highway 145 that blocked the road, The mudslides <br />were due to persistent rains that saturated the ground, <br /> <br />G <br /> <br />10112 <br /> <br />san migueLco_fieldrpt.doc <br />November 13, 2000 <br /> <br />.- <br />