My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03449
CWCB
>
Floodplain Documents
>
Backfile
>
3001-4000
>
FLOOD03449
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:27:19 PM
Creation date
10/4/2006 11:46:12 PM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
State of Colorado
Stream Name
All
Basin
Statewide
Title
Colorado Flood Proofing Manual
Date
10/1/1983
Prepared For
State of Colorado
Prepared By
CWCB
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />62 <br /> <br /> <br />Figure 7.7. Column tied to footing with <br />reinforcement. (Reference 7) <br /> <br />ANCHOR STRAP <br /> <br /> <br />REINFORCED <br />CONCRETE <br />PIER <br /> <br />, <br />~ : <br />" <br />III <br />i"1 <br />II <br />II <br />II <br />I: i <br />I II :..L-.--_ ~ ,. <br />---"--- 1 <br />RE~FORC~D--:7/i I -l-k ~J':"-;-~l a" MIN. <br />FOOTING ""'''V~-ff;ft-'1U~''''-::-'l:~::~ : <br />,. /~_~ /,"7" .... <br />(----~--./" '/ // <br />: r --.:1- ++- / 24'.24" <br />I ./ -"', ",/ MINIMUM <br />, I / <br />L_________J/.... <br /> <br />GRA~ _ <br /> <br />Figure 7,8, Columns tied to footing with <br />reinforcement. (Reference 7) <br /> <br />If the loading on piers is very high. a reinforced pier wall may be needed rather than columns. The <br />long dimension of the wall should run parallel with the direction of flood flow so that resistance to <br />the water is minimized, The wall construction may also be used in conjunction with posts <br />and piles. <br /> <br />7.3 Waterproofed Structures <br /> <br />7.3,1 General <br /> <br />Waterproofed structures include any structure that has its lowest floor elevation below the BFE. <br />Waterproofed structures must be adequately designed to structurally resist hydrostatic and hyd- <br />rodynilmic loads, with adequate closure of opening below the BFE, and require adequate anchor- <br />ing systems between structural components such as walls and footings, floor slabs and walls, and <br />superstructure to walls, Another primary concern for waterproofed structures is that all joints and <br />walls should be adequately sealed to prevent seepage of flood waters. Hydrostatic and hyd- <br />rodynamic loadings were presented in Chapter VI and application to walls and floor slabs is dis- <br />cussed in Capter XI. In Chapter VIII, various types and requirements of closure of openings below <br />the BFE are presented. Thus, the following sections will present and discuss recommended anchor- <br />ing systems and guidelines for waterproofing seals, <br /> <br />In general, there are three types of structures to which the following guidelines are applicable, <br />These include 1) one and two story buildings with a full basement, 2) with a crawl space or, 3) no <br />basement with grade level foundation, <br />
The URL can be used to link to this page
Your browser does not support the video tag.