My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03360
CWCB
>
Floodplain Documents
>
Backfile
>
3001-4000
>
FLOOD03360
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:27:03 PM
Creation date
10/4/2006 11:40:57 PM
Metadata
Fields
Template:
Floodplain Documents
County
Elbert
Stream Name
Kiowa Creek
Basin
South Platte
Title
Floodplain Information Report
Date
1/1/1976
Prepared For
Elbert County
Prepared By
United Western Engineers
Contract/PO #
&&
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Transmission Rates <br />F 1 rm Nonfl rm <br />(f/KW-YR) (Mills/KWH) <br /> <br />FY 1965 <br />FY 1974 (Present Rates) <br />FY 1983 (Proposed Rates)** <br /> <br />$4.50 <br />$6.60 <br />$10.27 <br /> <br />1 mill <br />1 mill <br />2 mills <br /> <br />, Firm Power Rates <br />Capaclty Charge Energy Charge <br />(J/KW-MO) (Mills/KWH) <br /> <br />FY 1962 <br />'F'I 1974 <br />FY 1977 <br />FY 1981 (Present Rate)* <br />FY 1983 (Proposed)** <br /> <br />1.275 <br />1.320 <br />1.340 <br />1.655 <br />2.150 <br /> <br />3.0 <br />3.0 <br />3.4 <br />4.0 <br />5.0 <br /> <br />FY 1962 <br />FY 1974 <br />FY 1977 <br />FY 1981 (Present Rate)* <br />FY 1983 (Proposed)** <br /> <br />Composite Rate @ 58.2% <br />Seasonal Load Factor <br />Mi 11 s/KWH <br />6.00 <br />6.11 <br />6.55 <br />7.89 <br />10.06 <br /> <br />FY 1976 <br />FY 1977 & thereafter <br /> <br />Rate for Unauthorized Overruns <br />b tlmes the f1rm P.ower ~ate <br />10 times the Firm Power Rate <br /> <br />*This rate was placed in effect in January 1981 on an interim basis, but was <br />disapproved on October 12, 1982 by the FERC. Western has the opportunity to <br />file a petition for rehearing, and must, under the procedures, file a <br />substitute rate in 120 days. . <br />**If feasibile, actual FY 1982 costs and rev~nues will be substituted for <br />estimates in the FY 1981 stUdy. This may moqify the proposed rates slightly. <br />A copy of any revisions in the FY 1981 studi$s will be supplied to interested <br />parties as soon as they are available. <br /> <br />The effective date for the proposed new rates is expected to be April 1, 1983. <br /> <br />A comparison of the average annual costs in the studies that support the <br />present rates (FY 1977 studies) and the proposed rates (FY 1981 studies) <br />reveals the following: ' <br /> <br />Average annual costs <br /> <br />FY 1977 Studies <br />(1978-2046 ) <br />$48 Mill ion <br /> <br />FY1981 Studies <br />(1!978-2057) Difference <br />$73 Million +$25 Million <br /> <br />The $25 million increase in average annual costs is attributable to O&M <br />(53%), power investments (16%), aid to participating projects (11%), <br />interest (10%), replacements (8%), and other '(2%). The other costs <br />consist primarily of energy purchases. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.