Laserfiche WebLink
<br />I. SUMMARY <br /> <br />Western Area Power Administration (Western) is distributing this brochure <br />to provide information on the proposed adjustment of Colorado River <br />Storage Project (CRSP) transmission and power rates. Public information <br />and comment forums will be held to provide additional information and to <br />hear from interested persons. After consultation and comment periods and <br />review of oral and written comments, the Assistant Secretary for <br />Conservation and Renewable Energy will announce a rate decision. If the <br />decision is to adjust rates, the new rates will be placed in effect on an <br />interim basis, and will be submitted to the Federal Energy Regulatory <br />Commission (FERC) for a final decision. <br /> <br />Authorization of the CRSP on April 11, 1956 by Public law 84-485 initiated <br />the comprehensive development of water resources of the Upper Colorado <br />River Basin. Power was authorized "as an incident" to other project <br />purposes. Initial generation began in 1963, and with subsequent <br />additions, the present capability is 1543 MW. This is expected to <br />increase to 1913 MW by fiscal year (FY) 1991. <br /> <br />Public law 84-485 provides that power revenues must pay all annual power <br />operation, maintenance, and replacement (OM&R) costs and all annual <br />storage unit irrigation OM&R costs except those paid by the municipal and <br />industrial (M&I) water users, and must repay all power investment costs <br />with interest in 50 years, all storage unit irrigation investment costs in <br />50 years except those paid by the M&I water users, and all participating <br />project irrigation investment costs in 50 years from the end of any <br />development periods, except those paid by the irrigation and M&I water <br />users. Power revenues also must pay the salinity control construction and <br />OM&R costs which are allocated to the Upper Colorado River Basin to comply <br />with Public law 93-320. <br /> <br />Power repayment studies are used to determine whether power revenues are <br />sufficient to pay all costs within the prescribed time periods. The CRSP <br />repayment study for FY 1981 using existing rates (current power repayment <br />study) shows that existing rates are insufficient to pay these costs. The <br />historical as well as the present and proposed transmission and power <br />rates are as follows: <br />