My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03336
CWCB
>
Floodplain Documents
>
Backfile
>
3001-4000
>
FLOOD03336
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:26:59 PM
Creation date
10/4/2006 11:40:25 PM
Metadata
Fields
Template:
Floodplain Documents
County
Ouray
Community
Ouray County
Stream Name
Portland Creek
Basin
Gunnison
Title
Soils Investigation Report for Portland Creek
Date
2/22/1983
Prepared For
Ouray County
Prepared By
Western Technologies
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Simons, Li and Associates, Inc. <br />Job. No. 6143J002 <br />Project: Portland Flume Reconstruction <br /> <br />existing alignment at these locations. Based on this informa- <br />tion, it does not appear that temporary support will be re- <br />quired for either of these structures due to their distance <br />from the proposed alignment. <br /> <br />3. Temporary support and permanent underpinning systems <br />must be designed and constructed such that an existing <br />structure will undergo less than 1/4 inch of total <br />differential settlement during construction. <br /> <br /> <br />End-Product Specifications: The following items relating to <br />temporary support and/or permanent underpinning systems are <br />offered for possible addition to the project documents: <br /> <br />1. It is anticipated that all structures indicated <br />will require some type of foundation support during <br />construction. Some of these structures will require <br />permanent underpinning as determined by the engineer <br />during construction. <br /> <br />2. The contractor will submit a design for a temporary <br />support and/or permanent underpinning system for each <br />indicated structure for review and possible modifica- <br />tion by the engineer prior to construction. <br /> <br />Limitations: The recommendations presented in this report are <br />based on the assumption that the soil conditions do not deviate <br />appreciably from those disclosed by the test pits. If any var- <br />iations are encountered during construction or if plans change, <br />the geotechnical engineer should be notified so that supple- <br />mental recommendations may be made if required. <br /> <br />-12- <br />
The URL can be used to link to this page
Your browser does not support the video tag.