My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03336
CWCB
>
Floodplain Documents
>
Backfile
>
3001-4000
>
FLOOD03336
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:26:59 PM
Creation date
10/4/2006 11:40:25 PM
Metadata
Fields
Template:
Floodplain Documents
County
Ouray
Community
Ouray County
Stream Name
Portland Creek
Basin
Gunnison
Title
Soils Investigation Report for Portland Creek
Date
2/22/1983
Prepared For
Ouray County
Prepared By
Western Technologies
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br />I <br />[I <br />I <br />I <br />I <br />I <br />I <br />1 <br />II <br />fl <br />] <br />- <br />~ <br />I <br />I <br />II <br />I <br />I <br /> <br />Simons, Li and Associates, Inc. <br />Job. No. 6143J002 <br />Project: Portland Flume Reconstruction <br /> <br />Structure No. 6P - (Sta. 8 + 941: It appears that the align- <br />ment of the flume will be shifted approximately 4 feet north <br />and deepened approximately 5 feet at this location. It appears <br />that this structure will require temporary support and possibly <br />some type of Bermanent underpinning, particularly along the <br />west end, due to the deepening of the flume at this location. <br />Several methods appear to be feasible for this structure. The <br />concrete and stone basement/stem wall will probably require <br />some lateral support. <br /> <br />Structure No. 7P - (Sta. 8 + 14):. It appears that the align- <br />ment of the flume will be shifted approximately 4 feet north <br />and deepened approximately 4 feet at thi~ location. Due to the <br />shallow stone footing present under this structure, it appears <br />that temporary support will be required. It is doubtful that <br />the stone foundation will clear span any reasonable distance, <br />therefore, some type of carrier beam will probably be re- <br />quired. <br /> <br />Structure No. 8P - (Sta. 7 + 30): No temporary support should <br />be required for this structure due to its distance from the <br />proposed new flume wall. The concrete slab adjacent to the <br />south end of the building is close enough to the proposed <br />alignment that it may require some support. <br /> <br />Structure No. 9P - (Sta. 2 + 65): No temporary support should <br />be required for this structure due to its distance from the new <br />proposed alignment. <br /> <br />Structure No. lOP - (Sta. 1 + 95) and Structure No. 11 P - <br />(Sta. 1 + 50): It appears from the proposed alignment that the <br />new flume will be located from 10 to 15 feet north of the <br /> <br />-11- <br />
The URL can be used to link to this page
Your browser does not support the video tag.