Laserfiche WebLink
<br />c.ONTRO~ <br />O() 0", <br />O~ ~ <br />;z ,. ~.r:..,t ~ <br />~ 1m ; <br />~c ~ ~fll <br />), ...Y3 <br />l\9...~o l'l...... <br />February 27, 1981 <br /> <br />CoIhy Reynol.. ~ Subject: Lower C1 ear Creek <br />ChairlTllln 0 <br />City of Den.... 0 <br />W G Duncon ~ Dear Dave: <br />Chlirm.n PTo- Tem ....l <br />Douglas County 8 This letter will constitute your formal notice to proceed with the <br />Ken_" ~~;:':h ~ Phase B portion of the Lower Clear Creek Major Drainageway Planning Study. <br />c"" of eon; ~ Accompanying this letter is the "Selected Phase B Plan" dated February 27, <br />W.llyToov& c 1981 which provides the detailed description of the selected alternate. <br />Boul..' County. In accordance with Paragraph 6 of our Agreement, your firm has up to 120 <br />noe,. ~ calendar days to complete the Phase B report and to submit six copies of <br />~ the draft Phase B report to the District. The last submittal date for <br />Bonn;eAII~on ~ draft Phase B report is June 25, 1981. <br />City 01 Ed~'N.ter :; <br /> <br />~~~~~~~ ; At this time I am scheduling the first progress meeting between the <br />Bob S"1lll' ~ District, local sponsors and your firm at 9:00 a.m. on Marth 31, 1981 at <br />....m.COUnly ~ the District offices. By a copy of this letter I am asking Wheat Ridge, <br />Ru1h A C=oI' . Arvada and Adams County to have a representative at thi s meeti ng. We look <br />C"" of Bou'''' m forward to seei ng what progress is beinq made by that time. Before you <br />Oo~~;~:, ~ resume work on this project, I suggest you reread the "Scope of Services" <br />V;June ~ and "Special Conditions" of our Agreement as they relate to the Phase B <br />City 01 Westminstef ~ work. <br />William H. McNichOlS . <br />City 01 Den_ t-. <br />John J, Nitt'loll ~ <br />ArIPf,I'IQe County ~ <br />Eugene L Otis ~ <br />City of Englewood w <br />Z <br />Atten E. Pdon 0 <br />Eng;n.r l <br />M L. ""Sam" SanclOI ~ <br />City of Oemw ~ <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />SECTION V <br /> <br />PHASE A ALTERNATIVES AND THE <br />SELECTED PHASE B PLAN <br /> <br />GENERAL COMMENTS <br /> <br />During the course of the Phase A p 1 ann i ng process, bi -week ly coordi nat i on <br />meetings were held at the Urban Drainage and Flood Control District (UD&FCD) <br />between representatives of the UD&FCD, Wright-McLaughlin Engineers (WME), the <br />Cities of Wheat Ridge and Arvada, and Adams County. <br /> <br />BoI;rd 01 Olrec1Ors <br /> <br />ExetUli\le Comminee' <br /> <br />Flood damage, high hazard and problem areas were identified, and alternatives <br />for reduction of flood hazard and hazard mitigation were developed, screened, <br />and analyzed. General categories of alternative solutions analyzed included <br />f 1 oodp 1 a in preservat i on; acqu i s it i on of floodprone propert i es; grass-l i ned <br />channels; rock-lined channels; structural-walled channels; and replacement/ <br />modification of selected bridge structures. <br /> <br />Benefit/cost analyses were conducted for the various alternatives, and the <br />Phase A Master Drainage Plan Report was published in September 1980. A sum- <br />mary of the benefit/cost analysis calculations is presented in Table V-I. <br />This table shows the costs associated with the different alternatives and the <br />effect they have on reducing the average annual flood damages. <br /> <br />Detailed information regarding unit prices and methodology utilized to <br />develop the benefit/cost comparisons may be found in the Phase A report. <br /> <br />The cities of Wheat Ridge and Arvada, Adams County and the Urban Drainage and <br />Flood Control District (UD&FCD) reviewed the recommended alternatives <br />presented in the Phase A Master Drainage Plan. A final decision was made by <br />the cities and the county and specific direction was given to the consultant <br />(WME), which is stated in the following letter from the UD&FCD. <br /> <br />L. Sco" Tucker, Executive Director <br /> <br />Treasurer <br /> <br />Mr. Dave Love <br />Wright-McLaughlin Engineers <br />2420 Alcott Street <br />Denver, Colorado 80211 <br /> <br />BRU/i s <br /> <br />Enclosure <br /> <br />cc: Ron Culbertson <br />Bud Coleman <br />Glen Gidley <br /> <br />:JC~ <br /> <br />Ben Urbonas, P.E. <br />Chief, Master <br />Planning Program <br /> <br />V-I <br /> <br />.-/' <br />