My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03254
CWCB
>
Floodplain Documents
>
Backfile
>
3001-4000
>
FLOOD03254
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:26:44 PM
Creation date
10/4/2006 11:34:52 PM
Metadata
Fields
Template:
Floodplain Documents
County
Logan
Community
Sterling
Stream Name
Pioneer Ditch
Basin
South Platte
Title
Master Drainageway Plan Pioneer Ditch at Sterling
Date
12/1/1995
Prepared For
Sterling
Prepared By
US Army Corps of Engineers
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />2.4 Section 22, Planning Assistance to States, Flooo Mitie~tion M,,",,'"r'" for th" SOllth <br />PIMt" Riv"r ~t Sterline, (Colorado. By the U;S. Army Corps of Engineers. Dated September <br />1989. <br /> <br />. <br /> <br />2.5 Resource Consultants & Engineers, Inc., of Fort Collins, Colorado. HEC-2 models <br />and discharge profiles for studies referenced in paragraphs 2. 1 and 2.2. <br /> <br />2.6 H~ndhook of Hydr~lIlic" By Brater & King. Dated 1976. <br /> <br />2.7 n"..ign Ollid"lin", ~nd (crit"ri~ for (ch~nn"l, ~nd HydTlmlic Stnlctllr'" on S~ndy Soil. <br />Prepared by Simons, Li & Associates, Inc., of Fort. Collins, Colorado. Prepared for Urban <br />Drainage and Flood ,Control District of Denver, Colorado. Dated June 1989. <br /> <br />2.8 TTrh~n Storm nrnin~ge (crit"ri~ M~nll~l, Volllme ?. Prepared by Wright-McLaughlin <br />Engineers, Denver, Colorado. Prepared for Urban Drainage and Flood Control District of <br />Denver, Colorado. Dated June 1969. Updated 1982. <br /> <br />2.9 nr~in~g" for Ar"",,' Oth"r Th~n Airfield" Technical Manual TM-5-820-4. Dated <br />October 1983. <br /> <br />2.10 Riprap guidance from Engineering Technical Letter ETL-1110-2-120. Dated May <br />1971. <br /> <br />2.11 Hydr~l11ic n",ign of Flood (Control (ch~nnel" Engineer Manual EM-1110-2-1601. <br />Dated July 1991. <br /> <br />3. TECHNICAL ANALYSIS <br /> <br />3.1 Tntrndllrtlnn <br /> <br />3.1.1 Pioneer Ditch begins in the southwest portion of Sterling near Westview and <br />Iris Drive. It flows north for approximately 1.8 miles and then turns to the east at Franklin <br />Street for 0.5 mile. At North 7th Avenue, the 4itch flows north again for about 0.5 mile and <br />then turns to the east at Pioneer Road. The ditch continues east for approximately 2 miles <br />before its confluence with the South Platte River. Pioneer Ditch has bridge or culvert crossings <br />(listed from upstream to downstream) at the Burlington Northern Railroad, Phelps Street, State <br />Highway 14, Franklin Street and North 7th Avenue, Pioneer Road and North 7th Avenue, <br />Sidney Avenue, the north- and south-bound lanes of U.S. Highway 138, the Burlington <br />Northern Railroad again, and the Union Pacific Railroad. Constrictions occur at many of the <br />bridge structures, and channel capacity is limited. Significant flooding can occur at relatively <br />frequent events. <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.