Laserfiche WebLink
<br />Feb~2~-~0 09:33A wrc engineering inc <br /> <br />3037578513 <br /> <br />P.03 <br /> <br />Commissioner Mark A. Arndt. Chairman <br />February 22, 2000 <br />WRC File: 2032/11 <br />Page 2 <br /> <br />C. 011 Oclober I L 1999, WRC providod Morgan Counly with 3 selS of plans for fmal check. A similar sel was <br />provided 10 CWeB on October 21,1999. <br />D. 011 October 21, 1999, sevenlCCn signed and sealed sets of completed plans wcrc provided to the County. <br /> <br />We are clUTently compiling and producing the mylars and digital files, and will be submitting them 10 Morgan Counly <br />shortly. <br /> <br />We have submitted to the County the following invoices, and their CUrTC1\1 slatus is as follows: <br /> <br />Invoice NQ Invoice Date Amount (S) Date Pavmetrt Rcceived <br />2032/1 February I, 1999 $5,475.00 March J 2, 1999 <br />203212 March 3,1999 $3,699.00 Much 19, 1999 <br />2032/3 April 6, 1999 52,5Q4,63 Decembcr I, 1999 <br />2032/4 May 6,1999 $5,20350 December I, 1999 <br />2032/5 May 24,1999 $4,293.13 December 1,1999 <br />2032/6 July 6, 1999 $8,8;5.65 Partial Paymenl December 1, 1999 <br />203217 Augusl9, 1999 $704.50 OUlstandillg <br />2032/8 Nowmber I, 1999 5864.62 OulsllUlding <br />2032/9 December 30, 1999 $218,22 Outstanding <br /> TOTAL: 531,1118,25 <br /> <br />As orlhe Ierminalion dale of Febru~' 15,2000, WRC has lllcurred a 10101 cost of$43, 725.63 for lhis projecl, We have <br />slOpped all work related to this projecl, <br /> <br />As )'ou can see, Ihe proj ect delays were beyond our control since the requesled smveymg was nol dcli vered until October <br />19, 1999; and a sllbslantial change in the project design was requesled by Morgan County on July 2\, 1999. As 10 the project <br />coordinalilln. lhis responsibilily cleuJy did nol rest witll WRC as provided for in our contracl witll the CIlUllIY. WRC used <br />thc M&S Standards of CDOT 10 prepare the constructilln docwnents for lhe Weldona Project lIS per the ~eope of ser.ices. <br /> <br />We arc sorry that you took the aclion to terminate the CQntract, and allhe same time we are respectful of your decisions <br />and aclions. Resl assured that WRC will help in the transition oflh.is projecl and wiu cooperalC, by pro\~dinllll1e information <br />alrcad~ de,eloped by WRC. to tile engineer selected by ML'Jrgan Counly 10 complete the project. <br /> <br />Very truly yours, <br /> <br />WRC ENGINEERING. INC. <br />~//~~ <br /> <br />Alan li'eak, P.E <br />Presidel11 <br /> <br />co: Mr. Bob Brooks. E"cculive Diteclor, Departmenl of Local Affairs <br />Mr. Tom Flrownio.~, CWCB <br /> <br />..alajUmag <br />