My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03190
CWCB
>
Floodplain Documents
>
Backfile
>
3001-4000
>
FLOOD03190
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:26:34 PM
Creation date
10/4/2006 11:31:42 PM
Metadata
Fields
Template:
Floodplain Documents
County
Morgan
Community
Weldona
Basin
South Platte
Title
Flood Mitigation Project - Schaefer Draw/South Platte Basin
Date
8/1/1996
Floodplain - Doc Type
Flood Mitigation/Flood Warning/Watershed Restoration
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />Task 6 - Cost Estimate: <br />The Contractor shall provide a table of refined construction cost information for the proposed <br />(recommended) local storm drainage component to be included in the final report. (Estimation <br />of construction costs for the alternatives were included in Task 4). <br /> <br />The Corps and the CWCB will provide cost estimates for the major drainageway component of <br />the project. <br /> <br />Preliminary Desi!!n Criteria <br />All preliminary designs of channels, levees, culverts, detention facilities, and other major <br />drainagway features shall be consistent with FEMA, Corps of Engineers, or State of Colorado <br />design criteria for flood control works (whichever may apply, and whichever would be the most <br />stringent criteria for a given flood control feature). The major drainageway designs shall <br />provide flood protection to the lOO-year flood frequency. Local storm drainage improvements <br />and preliminary designs for storm drain systems shall have capacity for the 5-year flood <br />frequency. <br /> <br />Meetin!!s and Coordination <br />At least three informal progress meetings shall be held between Contractor and CWCB during <br />the course of the Project. The first meeting will consist of a half-day on-site tour of the Project <br />area. The second and third meetings will be held to discuss and review work progress, to <br />coordinate work efforts, and to provide input to the Contractor. Meetings times will be mutually <br />agreed upon at key project phases and scheduled accordingly. <br /> <br />. <br /> <br />The CWCB Project Manager, Mr. Tom Browning, shall coordinate activities performed by the <br />Project participants. Any Project-related questions or problems shall be directed to Tom <br />Browning at (303) 866-3441. The Contractor shall provide the name of one person who will <br />serve as the main point of contact for all communications between CWCB and Contractor. <br /> <br />Survey and Mappin!! Information <br />A survey Subconsultant will obtain field survey information and will provide topographic base <br />sheets for the project. The survey subconsultant will perform the survey and mapping tasks as a <br />subconsultant to the Contractor. The survey Subconsultant shall be paid directly by the <br />engineering Contractor for the lump sum total amount of $6,490. Survey Subconsultant shall <br />invoice the Contractor directly, and shall be paid within 10 days after the engineering Contractor <br />receives said State funding for the Project. <br /> <br />. <br /> <br />Completion of Work <br />The contractor shall complete all work as assigned in this Scope of Work no later than January <br />15, 1998. Completion of the work will include the acceptable performance of tasks and the <br />delivery of ten (10) copies of the final report with included drawings, figures, and maps. Report <br />format shall be a comb-bound 8.5" by II" report with a color cover (cover to be approved by <br />CWCB), an index, an executive summary, the main body of the report text, and a map pocket at <br />the end of the report that contains large size maps, drawings, and/or preliminary design sheets. <br />Contractor shall also deliver two (2) sets of error free and virus free 3.5" high density floppy <br />disks containing digital files of the final report and other project related design files. Pinal report <br />shall be provided in Microsoft Word format (version 6.0 or later). <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.