My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03190
CWCB
>
Floodplain Documents
>
Backfile
>
3001-4000
>
FLOOD03190
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:26:34 PM
Creation date
10/4/2006 11:31:42 PM
Metadata
Fields
Template:
Floodplain Documents
County
Morgan
Community
Weldona
Basin
South Platte
Title
Flood Mitigation Project - Schaefer Draw/South Platte Basin
Date
8/1/1996
Floodplain - Doc Type
Flood Mitigation/Flood Warning/Watershed Restoration
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />Proiect Assil!nments <br />Study tasks will be divided among the Project participants as stated in the "summary of <br />requested work" section of this Scope of Work" The attached "Report Outline" will be the basis <br />for performing the required work and completing the final Project report" The task assignments <br />are summarized in the table below" <br /> <br />PROJECT ASSIGNMENTS <br /> <br /> <br />I <br /> <br />Obtain topographic mapping for project area <br /> <br />2 <br />3 <br /> <br />Pro"ect coordination and overall ro"ect mana ement <br />Performance of all tasks and report writing to complete chapter I <br />(Problem Descri tion) of the ro"ect re ort <br />Performance of all tasks and report writing to complete chapter <br />II (Proposed Solutions) of the project report <br /> <br />4 <br /> <br />5 <br /> <br />Performance of all tasks and report writing to complete chapter <br />III (Description of Proposed Project) of the project report <br /> <br />6 <br /> <br />Performance of all tasks and report writing to complete chapter <br />IV (Cost Estimate) of the project report <br /> <br />7 <br /> <br />Performance of all tasks and report writing to complete chapter <br />V (Cost Effectiveness) of the ro"ect re ort <br />Performance of all tasks and report writing to complete chapter <br />VI (National Flood Insurance Pro ram) of the ro" ect re ort <br />Performance of all tasks and report writing to complete chapter <br />VII (Environmental Information) ofthe ro"ect re ort <br />Performance of all tasks and report writing to complete chapter <br />VIII (Work Schedule) of the ro" ect re ort <br />Performance of all tasks and report writing to complete chapter <br />IX (Authorization) of the ro"ectre ort <br />Compilation of all text, maps, figures/drawings, and executive <br />summ for final re ort" Editin and ublication of final re ort" <br />Compilation of all materials and publication of the final <br />A endix (Technical Addendum) of the ro"ect re ort <br />Compilation of all materials for the "Summary of Attachments" <br />ofthe ro"ect <br />Any public meetings or necessary communications with <br />residents, local officials, or other interested parties <br /> <br />8 <br /> <br />9 <br /> <br />10 <br /> <br />II <br /> <br />12 <br /> <br />13 <br /> <br />14 <br /> <br />15 <br /> <br />3 <br /> <br />Independent <br />Survey <br />Subcontractor <br />CWCB <br />CWCB <br />Mor an Count <br />Corps <br />CWCB <br />Contractor <br />Corps <br />CWCB <br />Contractor <br />Corps <br />CWCB <br />Contractor <br />CWCB <br />Co s <br />CWCB <br />Mor an Count <br />Contractor <br /> <br />CWCB <br /> <br />CWCB <br /> <br />Contractor <br /> <br />Contractor <br /> <br />Contractor <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.