Laserfiche WebLink
<br />VERSION 1.0 1/12/95 <br /> <br />TUTORIAL <br /> <br />t <br /> <br />Other Relocation <br />Costs ($/month) <br /> <br />Total Relocation <br />Costs <br /> <br />TOTAL <br />MITIGATiON <br />PROJECT <br />COSTS <br /> <br />GREEN Block (Data Input). Enter 500 (five hundred) dollars in other <br />relocation costs per month. Move to the next entry. <br /> <br />YELLOW Block (Result). The program displays $7,000 as the total <br />relocation costs for the mitigation project. Move to the next entry. <br /> <br />YELLOW Block (Result): The program displays $53,205 as the total <br />mitigation project costs. This total includes the mitigation project costs, <br />the present value of the annual maintenance costs, and the relocation <br />costs for the project. Move to the next entry. <br /> <br />FLOOD HAZARD <br /> <br />Flood Data <br /> <br />I' <br /> <br /> <br />GREEN Blocks (Data Input). Complete the Fiood Data chart with the <br />information as shown above, for Flood Frequency, Discharge and <br />Elevation. These data, along with the Zero Flood Depth Eievation of <br />the facility under evaluation determine the extent of flood risk at the site. <br />For more information about how flood hazards are modeled in the <br />program, see Chapter 7, Benefit-Cost Program: Flooc! Hazard Risk. <br /> <br />To view the calculated flood estimates, move down on.the flood hazard <br />page with the arrow keys or mouse. <br /> <br /> <br />4-14 <br />