Laserfiche WebLink
<br />VERSION 1.0 1/12/95 <br /> <br />TUTORIAL <br /> <br />MITIGATION <br />COSTS <br /> <br />Mitigation <br />Project Cost <br /> <br />Base Year of <br />Costs <br /> <br />ANNUAL <br />MAINTENANCE <br />COSTS ($/year) <br /> <br />Present Value of <br />Annual <br />Maintenance <br />Costs <br /> <br />RELOCATION <br />COSTS FOR <br />MITIGATION <br />PROJECT <br /> <br />Relocation Time <br />Due to Project <br /> <br />Rentai Cost <br />During Occupant <br />Reiocatlon <br /> <br />MlIIgallon Project Cost (excluding relocation costsl <br />:. ':::".:-,8,asB_'Year:_ofC,osts,',' ." -' '." <br />IiDnual Maintenance Cost'l$IYaar) " <br />~; ,". ..,.,Pr,e.ent Value. or Annual, Maintenance Costs 1$1 <br />RelocatloriCostsfor MIUgaUon Project: ','. '. . ,." , <br />;,.:.,!. :Rol~~aIIo,nTlrne Due t,o Pioject (mo~'I':",' ,,' .' ','> ,; <br />r;.i::~oritalC~stil.~rlnilO~cuJlant Relocallori 1$!sf1!"o~)' <br />':,;:'ltontalCOst. during Occupant Relocallon,($/!"onthh <br />.:..:;..Ot!ili, RoIOl:~~cI~!lOo(S I$!moriUi), :'::";,i' :;}{,.\i:', <br />:: '<:':.'::',"'otal,:R8:loC:~(tn~_CostS;"::_':-'.l':/; ";'.; ~< ,: -:. '.<.)-'-\;:-< ',', -,- <br />,O~l\I!ll~i!iIo~P'.jj,,~CcI#; ",': .:..,,'."'.,. A'" <br /> <br /> <br /> <br />""".<'\'"""'0"":' <br /> <br /> <br />..",:.,.,.",,'.. ,', ,'" <br />, ' <br />"':0. 0 <br />,"': 53 <br /> <br /> <br />GREEN Block (Data Input). Enter 40000 (forty thousand) as the <br />mitigation project cost, excluding relocation costs. Move to the next <br />entry. <br /> <br />PINK BLOCK (Information Only). Enter 1994. Move to the next <br />entry. <br /> <br />GREEN Block (Data Input). Enter 500 (five hundred) as the annual <br />maintenance costs. Move to the next entry. <br /> <br />YELLOW Block (Result). The program calculates $6,205 as the <br />present value of annual maintenance costs. This calculation is based <br />on the annual maintenance costs, the project useful lifetime, and the <br />discount rate. Move to the next entry. <br /> <br />In this section, the time and costs associated with occupant relocation <br />during the construction of the mitigation project are estimated. <br /> <br />GREEN BLOCK (Data, input): Enter 2 for two months of relocation <br />time necessary for the mitigation project. Move to the next entry. <br /> <br />GREEN Block (Data input): Enter 2.00 for $2.00 per square foot per <br />month as the rental cost during occupant relocation for the mitigation <br />project. Move to the next entry. <br /> <br />YELLOW Block (Results): The program displays $3,000, as the <br />monthly rental cost incurred during occupant relocation for the <br />mitigation project. Move to the next entry. <br /> <br />4-13 <br />