Laserfiche WebLink
<br />2 <br /> <br />The following table is a partial listing of existing and modified BFEs: <br /> <br />Location <br /> <br />Existing BFE <br />(feet) * <br /> <br />Modified BFE <br />(feet)* <br /> <br />Approximately 350 feet upstream of Wyoming Street <br />Approximately 100 feet upstream of Wyoming Street <br /> <br />5,934 <br />5,924 <br /> <br />5,932 <br />5,924 <br /> <br />*Referenced to the National Geodetic Vertical Datum, rounded to the nearest whole foot <br /> <br />Public notification of the modified BFEs will be given in the Golden Transcript on or about April 17 and <br />April 24, 1998, A copy of this notification is enclosed, In addition, a notice of changes will be published <br />in the Federal Register, Within 90 days of the second publication in the Golden Transcript, a citizen may <br />request that FEMA reconsider the determination made by this LOMR, Any request for reconsideration <br />must be based on scientific or technical data, All interested parties are on notice that, until the 90,day <br />period elapses, the determination to modify the BFEs presented in this LOMR may itself be modified, <br /> <br />Because this LOMR will not be printed and distributed to primary users, such as local insurance agents and <br />mortgage lenders, your community will serve as a repository for these new data, We encourage you to <br />disseminate the information reflected by this LOMR throughout the community, so that interested persons, <br />such as property owners, local insurance agents, and mortgage lenders, may benefit from the information, <br />We also encourage you to prepare a related article for publication in your community's local newspaper. <br />This article should describe the assistance that officials of your community will give to interested persons <br />by providing these data and interpreting the NFIP maps. <br /> <br />We will not physically revise and republish the FIRM and FIS report for your community to reflect the <br />modifications made by this LOMR at this time, When changes to the previously cited FIRM panel(s) and <br />FIS report warrant physical revision and republication in the future, we will incorporate the modifications <br />made by this LOMR at that time, <br /> <br />Because this revision does not involve floodway changes, we are not revising the Flood Boundary and <br />Floodway Map (FBFM); therefore, no annotated copies of the FBFM are enclosed. Unless a subsequent <br />physical map revision involves floodway changes for the FBFM panel(s), we will not revise the FBFM to <br />show the modifications described in this LOMR, <br /> <br />This LOMR is based on minimum floodplain management criteria established under the NFIP. Your <br />community is responsible for approving all floodplain development, and for ensuring all necessary permits <br />required by Federal or State law have been received. State, county, and community officials, based on <br />knowledge of local conditions and in the interest of safety, may set higher standards for construction in the <br />SFHA, If the State, county, or community has adopted more restrictive or comprehensive floodplain <br />management criteria, these criteria take precedence over the minimum NFIP criteria, <br /> <br />The basis of this LOMR is, in whole or in part, a channel,modification/culvert project. NFIP regulations, <br />as cited in Paragraph 60,3(b)(7), require that communities ensure that the flood,carrying capacity within <br />the altered or relocated portion of any watercourse is maintained, This provision is incorporated into your <br />community's existing floodplain management regulations, Consequently, the ultimate responsibility for <br />maintenance of the modified channel and culvert rests with your community, <br />