My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03137
CWCB
>
Floodplain Documents
>
Backfile
>
2001-3000
>
FLOOD03137
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:26:25 PM
Creation date
10/4/2006 11:29:13 PM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Basin
Statewide
Title
Guide for Flood and Flash Flood Preparedness Planning
Date
5/1/1977
Prepared For
USDOC
Prepared By
USDOC
Floodplain - Doc Type
Flood Mitigation/Flood Warning/Watershed Restoration
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />e <br /> <br />e <br /> <br />, <br /> <br />G. Plan Maintenance Element <br /> <br />Planning Objectives <br /> <br />To update, extend and improve the <br />flood preparedness plan and to insure <br />readiness for executing the plan. <br /> <br />Planning Tasks <br /> <br />Plan Updating <br />Plan Improvement <br />Plan Practice <br /> <br />Planning Guidance <br />Plan Updating Task <br /> <br />G1. Establish procedures and schedules for <br />plan contents subject to rapid obsoles- <br />cence including: <br /> <br />a. addresses, teiephone numbers, and <br />names of key participants; <br />b. assignments of responsibility; <br /> <br />c. changes in flood potential; <br /> <br />d. areas requiring evacuation; <br />e. availability of facilities for reception <br />centers; <br />f. evacuation routes and priorities; <br /> <br />g. flood fighting requirements; <br />h. utility extensions or system modifi- <br />cations; and <br />i. traffic control requirements. <br /> <br />G2. Establish procedures for updating of <br />plan contents based on specific events <br />such as: <br /> <br />a. construction of or modification in <br />the operation of upstream water control <br />structures which affect the height, se- <br />verity, or time of flooding; <br />b. natural or unplanned events which <br />modify the flood potential; and <br />c. construction or modification in the <br />operation of facilities in or downstream <br />of the community which increases the <br />height, severity, or duration of floods. <br /> <br />Planning Guidance <br />Plan Improvement Task <br /> <br />G3. Describe needed and planned exten- <br />sions of the warning system and pre- <br />paredness plan including: <br /> <br />a. coverage of additional area; and <br />b. incorporation of elements, tasks and <br />subtasks omitted from the initial plan. <br /> <br />G4. Describe needed and planned refine- <br />ments to the warning system and pre- <br />paredness plan including: <br /> <br />a. provision of additional observers, <br />gages and flash flood alarms to im- <br />prove the flood recognition system; . <br />b. more detailed identification of areas <br />to be evacuated; <br /> <br />c. strengthening of communications in- <br />volved in all aspects of the plan; and <br />d. development of additional subplans <br />for various affected organizations and <br />locations. <br /> <br />G5. Establish procedures for the critical <br />evaluation of performance in real and <br />simulated implementation of the plan <br />including: <br /> <br />a. process for initiation, organization <br />and conduct of the evaluation; and <br />b. process for modification of the plan <br />based on findings of the evaluation. <br /> <br />Planning Guidance <br />Plan Practice Task <br /> <br />G6. Establish procedures and schedules <br />for testi ng those aspects of the flood <br />warning system and preparedness plan <br />which are susceptibie to periodic use <br />such as: <br /> <br />a. procedures for communication with <br />observe.r networks, NWS and other <br />federal offices, special warning recipi- <br />ents, organizations and officials re- <br />sponsible for warning dissemination <br />and plan execution, and others as may <br />be appropriate; <br />b. communications equipment includ-. <br /> <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.