My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03137
CWCB
>
Floodplain Documents
>
Backfile
>
2001-3000
>
FLOOD03137
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:26:25 PM
Creation date
10/4/2006 11:29:13 PM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Basin
Statewide
Title
Guide for Flood and Flash Flood Preparedness Planning
Date
5/1/1977
Prepared For
USDOC
Prepared By
USDOC
Floodplain - Doc Type
Flood Mitigation/Flood Warning/Watershed Restoration
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />e <br /> <br />e <br /> <br />c. interdependencies on other services <br />and facilities including utilities; <br />d. temporary floodproofing or other ac- <br />tions required to prevent the loss of <br />service or function; and <br />e. need for and means of providing <br />auxiliary power, heat, water, sewage <br />disposal and other services necessary <br />for continued operation of vital facili- <br />ties. <br /> <br />eg. Establish operational procedures for <br />police, fire, utility repair, rescue, medi- <br />cal and other services prior to and dur- <br />ing floods including: <br /> <br />a. placement of equipment and person- <br />nel to prevent loss of access due to <br />flooding of roads and underpasses or <br />failure of bridges; <br /> <br />D. Recovery Element <br /> <br />b. means of relaying calls for assist- <br />ance and coordinating responses; and <br /> <br />c. alternate routes for entering areas <br />where traffic is controlled and avoiding <br />evacuation routes. <br /> <br />C10. Establish procedures for evacuation or <br />protection of important records and <br />documents located in areas subject to <br />flooding including those relating to: <br /> <br />a. vital statistics; <br /> <br />b. tax and payroll information; <br /> <br />c. court records; <br /> <br />d. utility records; <br /> <br />e, property ownership; and <br /> <br />f. business records. <br /> <br />Planning Objectives <br /> <br />To initiate and carry out post flood <br />actions to maintain public health, re- <br />turn community services to normal at <br />the earliest possible time and to pro- <br />vide aid ,and assistance in recovery, <br /> <br />Planning Tasks <br /> <br />Maintenance of Public Health <br />Return of Services <br />Rehabilitation and Repair <br />Mobilization of Assistance <br /> <br />Planning Guidance <br />Maintenance of Public Health Task <br /> <br />01. Establish procedures for handling of <br />the dead including: <br /> <br />a. morgue location and method of op- <br />eration; <br />b, handling of personal effects; and <br />c. identification and release of bodies. <br /> <br />02. Establish procedures for actions to pre- <br />serve pUblic health including: <br /> <br />a. provIsion of emergency medical <br />services and care for injured persons; <br /> <br />b. procedure for locating mIssing per- <br />sons and providing information to <br />friends and relations; <br />c. collection and destruction of con- <br />taminated foodstuffs; <br />d. disinfection of private water supply <br />sources and systems; <br />e, innoculations and other preventive <br />medical care; <br />f. disease control; and <br />g. control of insects, rodents and <br />other pests, <br /> <br />Planning Guidance <br />Return of Services Task <br /> <br />03. Establish procedures for actions to re- <br />sume provision of utility services in- <br />cluding: <br /> <br />a. preparations to be made by property <br />owners; <br />b, system preparations including de- <br />contamination of water supplies; <br />c. sequence for returning services; and <br />d. priority for resuming services. <br /> <br />04. Establish procedures for returning to <br />normal traffic patterns including: <br /> <br />a. evaluation of road and bridge safety; <br />b. debris clearance; and <br />c. priority for providing access. <br /> <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.