Laserfiche WebLink
<br />TABLE 16. -. (Cont'd) <br /> <br />Dike length, feet {including ~'eir) <br />Top width, feet <br />lIeight, feet <br />Side slopes <br />Slope protection <br /> <br />Riprap, gravel <br /> <br />10,100 <br />" <br />" <br />1 on 2.5 <br />andspa1ls <br /> <br />OlVERSION G!ANNEI.-A: <br />Lengtll,feet <br />llaselength, feet <br />Side slopes <br />Grouted riprap stabilizers, each <br />Low..flowchannel: <br />Length, feet <br />Base width, feet <br />Side slopes <br />Structure, box culverts <br />Maximl.U"desicndischarge,c.f.s. <br /> <br />14,160 <br />350 <br />1 on 2.5 <br />" <br /> <br />, <br /> <br />5,000 <br />100 <br />lon2.5 <br />IO'xlO' <br />5,000 <br /> <br />ARROYO DIKE.ll: <br />Length, feet <br />Top width, feet <br />lleight, feet <br />Side slopes <br />Slope protection <br /> <br />4,850 <br />" <br />" <br />Same as Dam <br />Same as Dam <br /> <br />ARROYOClIANNF.L-C: <br />Length,fcet <br />Rasowidth, feet <br />Sidoslopes <br />Grouted riprup stabilizers, each <br /> <br />3,550 <br />350 <br />I on ~.5 <br />, <br /> <br />tll!COCIIA.'lNEL-F: <br />Length, foet <br />Base width, feet <br />Sideslopcs <br />Groutedriprapstabilizers, each <br /> <br />9,000 <br />100 <br />I on 2.5 <br />9 <br /> <br />ClIICODlKE-F: <br />Length, feet <br />Top ~'idth, foet <br />Height.foet <br />Side slopes <br />Slopo protection <br /> <br />9,850 <br />" <br />" <br />Same as Dam <br />Same as Dallt <br /> <br />RELOCATION'S: <br />County roads, mile <br />New bridges, each <br />Pipeline, mile <br /> <br />10 <br />, <br />I, <br /> <br />1-37 <br /> <br />TABLf.17.-- <br /> <br />r <br />I <br />I <br />I <br />I <br />, <br /> <br />Cost <br />Class <br /> <br />01 <br /> <br />I <br />I <br />, <br />, <br /> <br />Ol <br /> <br />" <br /> <br />Estimated first Cost and Annual Charges Fountain <br />Off.Stream Site (January 1969 price levelsl <br /> <br />Creek <br /> <br />Item <br /> <br />Quantity Unit <br /> <br />Una <br />Cost <br /> <br />Total <br /> <br />F~D~RAL fIRST COST <br /> <br />landS and Darna~es: <br />Lands, Fee irrigated <br />Lands,Fee <br />Lands,EasenlCnt <br />Contingencies <br /> <br />,," <br />3,950 <br />;00 <br /> <br />500.00 <br />150.00 <br />75.00 <br /> <br />Am <br />Acre <br />Acre <br /> <br />11)0,1)00 <br />592,500 <br />37,500 <br />I46,000 <br />876,000 <br /> <br />Subtotal,Lands <br /> <br />Acquisition <br />Contingencies <br /> <br />87,601) <br />I7,400 <br />105,00Q <br /> <br />Suhtota',Acquisition <br /> <br />TOTAL, LANDS ANO DAMAGES <br /> <br />981,000 <br /> <br />Relocations: <br />County Road <br />Bridges <br />Pipoli"e <br />Contingencies <br /> <br />10 !.1ile <br />2 Each <br />6 Mile <br /> <br />35,000.00 <br />l..S. <br />100,000.00 <br /> <br />350,000 <br />150,000 <br />600,000 <br />220,000 <br /> <br />TOTAL, RELOCATIONS <br /> <br />$i,320,OOO <br /> <br />0=.$: <br />~eral: <br />Diversion and care of ".ater <br />Gag", ~nd in<trll","1\tation <br />ContinJ:encies <br /> <br />Job <br />Job <br /> <br />L.S. <br />L.S. <br /> <br />100,000 <br />20,000 <br />24,000 <br /> <br />Subtotal, Ceneral <br /> <br />144,000 <br /> <br />[}iversion ~'eir and dill.': <br />;,eir,eOnCt"te 58,933 c.Y. 36.0 2,12I,S88 <br />(nd wall, concrete ISO C. Y. 40 .00 6~000 <br />Reinforcing steel 5,893,300 LII. O.1<i 942.928 <br />Stripping 16,360 C.Y. 0.43 7,034 <br />Cut off trench 128,250 C.Y. 0.60 76,950 <br />Embankment (placing) 1,12b,gSO C.Y. 0.15 169,047 <br />Ripr"p 29,200 C.Y. 6.00 175,200 <br />Spal\S 16,470 C.Y. 4.50 74,115 <br />Gravel 14,I'>OU C.Y. ".OOl 58,400 <br />ContlnRenCle~ 758,738 <br />SU<'~"tal, WlvcrSH>n ileir and lllk., $4,390,000 <br />--------------------------------.~--_._----------------------- _._-~.-._--- <br /> <br />1_38 <br />