|
<br />TABLE 16. -. (Cont'd)
<br />
<br />Dike length, feet {including ~'eir)
<br />Top width, feet
<br />lIeight, feet
<br />Side slopes
<br />Slope protection
<br />
<br />Riprap, gravel
<br />
<br />10,100
<br />"
<br />"
<br />1 on 2.5
<br />andspa1ls
<br />
<br />OlVERSION G!ANNEI.-A:
<br />Lengtll,feet
<br />llaselength, feet
<br />Side slopes
<br />Grouted riprap stabilizers, each
<br />Low..flowchannel:
<br />Length, feet
<br />Base width, feet
<br />Side slopes
<br />Structure, box culverts
<br />Maximl.U"desicndischarge,c.f.s.
<br />
<br />14,160
<br />350
<br />1 on 2.5
<br />"
<br />
<br />,
<br />
<br />5,000
<br />100
<br />lon2.5
<br />IO'xlO'
<br />5,000
<br />
<br />ARROYO DIKE.ll:
<br />Length, feet
<br />Top width, feet
<br />lleight, feet
<br />Side slopes
<br />Slope protection
<br />
<br />4,850
<br />"
<br />"
<br />Same as Dam
<br />Same as Dam
<br />
<br />ARROYOClIANNF.L-C:
<br />Length,fcet
<br />Rasowidth, feet
<br />Sidoslopes
<br />Grouted riprup stabilizers, each
<br />
<br />3,550
<br />350
<br />I on ~.5
<br />,
<br />
<br />tll!COCIIA.'lNEL-F:
<br />Length, foet
<br />Base width, feet
<br />Sideslopcs
<br />Groutedriprapstabilizers, each
<br />
<br />9,000
<br />100
<br />I on 2.5
<br />9
<br />
<br />ClIICODlKE-F:
<br />Length, feet
<br />Top ~'idth, foet
<br />Height.foet
<br />Side slopes
<br />Slopo protection
<br />
<br />9,850
<br />"
<br />"
<br />Same as Dam
<br />Same as Dallt
<br />
<br />RELOCATION'S:
<br />County roads, mile
<br />New bridges, each
<br />Pipeline, mile
<br />
<br />10
<br />,
<br />I,
<br />
<br />1-37
<br />
<br />TABLf.17.--
<br />
<br />r
<br />I
<br />I
<br />I
<br />I
<br />,
<br />
<br />Cost
<br />Class
<br />
<br />01
<br />
<br />I
<br />I
<br />,
<br />,
<br />
<br />Ol
<br />
<br />"
<br />
<br />Estimated first Cost and Annual Charges Fountain
<br />Off.Stream Site (January 1969 price levelsl
<br />
<br />Creek
<br />
<br />Item
<br />
<br />Quantity Unit
<br />
<br />Una
<br />Cost
<br />
<br />Total
<br />
<br />F~D~RAL fIRST COST
<br />
<br />landS and Darna~es:
<br />Lands, Fee irrigated
<br />Lands,Fee
<br />Lands,EasenlCnt
<br />Contingencies
<br />
<br />,,"
<br />3,950
<br />;00
<br />
<br />500.00
<br />150.00
<br />75.00
<br />
<br />Am
<br />Acre
<br />Acre
<br />
<br />11)0,1)00
<br />592,500
<br />37,500
<br />I46,000
<br />876,000
<br />
<br />Subtotal,Lands
<br />
<br />Acquisition
<br />Contingencies
<br />
<br />87,601)
<br />I7,400
<br />105,00Q
<br />
<br />Suhtota',Acquisition
<br />
<br />TOTAL, LANDS ANO DAMAGES
<br />
<br />981,000
<br />
<br />Relocations:
<br />County Road
<br />Bridges
<br />Pipoli"e
<br />Contingencies
<br />
<br />10 !.1ile
<br />2 Each
<br />6 Mile
<br />
<br />35,000.00
<br />l..S.
<br />100,000.00
<br />
<br />350,000
<br />150,000
<br />600,000
<br />220,000
<br />
<br />TOTAL, RELOCATIONS
<br />
<br />$i,320,OOO
<br />
<br />0=.$:
<br />~eral:
<br />Diversion and care of ".ater
<br />Gag", ~nd in<trll","1\tation
<br />ContinJ:encies
<br />
<br />Job
<br />Job
<br />
<br />L.S.
<br />L.S.
<br />
<br />100,000
<br />20,000
<br />24,000
<br />
<br />Subtotal, Ceneral
<br />
<br />144,000
<br />
<br />[}iversion ~'eir and dill.':
<br />;,eir,eOnCt"te 58,933 c.Y. 36.0 2,12I,S88
<br />(nd wall, concrete ISO C. Y. 40 .00 6~000
<br />Reinforcing steel 5,893,300 LII. O.1<i 942.928
<br />Stripping 16,360 C.Y. 0.43 7,034
<br />Cut off trench 128,250 C.Y. 0.60 76,950
<br />Embankment (placing) 1,12b,gSO C.Y. 0.15 169,047
<br />Ripr"p 29,200 C.Y. 6.00 175,200
<br />Spal\S 16,470 C.Y. 4.50 74,115
<br />Gravel 14,I'>OU C.Y. ".OOl 58,400
<br />ContlnRenCle~ 758,738
<br />SU<'~"tal, WlvcrSH>n ileir and lllk., $4,390,000
<br />--------------------------------.~--_._----------------------- _._-~.-._---
<br />
<br />1_38
<br />
|