Laserfiche WebLink
<br />23 Off-atream aite.- This dam and reservoir site is locat~d <br />about S ~~~es north of the city limits of Pueblo. The project would <br />control S03 square m~les of drainage area above the dam. The plan <br />includes a main dam, diversion channels, and diversion dites. The <br />do~ and reSerVOlr hove been designed to control the estimated IOO-year <br />sediment deposit and the volume of the IOO-yearflood. Diversion <br />Channel-A was deSlgned to accept the standard project flood flow, but <br />the reservoir lacks capacity to store the volume. The project would <br />originate with a diversion structure across fountain Creek near the <br />EI Paso _ pueblo county line. The concrete ogee diversion weir would <br />be constructed in the streambed to discharge a portion of the spillway <br />design flood and divert all flows up to the standard project flood <br />discharge. A low-flow channel would be constructed in Diversion Chan- <br />nel-A to return normal flows to the Fountain Creek channel about one <br />mile downstream from the diversion. Thc reservoir capacity at spillway <br />crest would be 169,000 acre. feet of which 129,000 acre-feet would be for <br />flood control and 40,000 acre-feet for sediment retention. The spillway <br />would be cut through a saddle about 0.75 mile east of the cost abutment, <br />Erosion control would be effected by a long flat slope and a concrete and <br />riprap weir across the entire width. The outlet works would be located <br />in the center of the embankment at the low paint. <br /> <br />24. Since the reservoir would be located ncar the top of the <br />watershed it would be necessary to construct Chico Dike-F to raise the <br />water surface above elevation 5J60. To drain the water whiCh would be <br />trapped above the divide, it would be necessary to construct Chico <br />Channel-E. All dikes would have a cut-off trench, trapezoidal in <br />cr05ssectionwithalO-footbottomwidthandlonlsideslol'es, <br />excavated to shnlc. <br /> <br />25. The esti~ated costs and engineering features are for a flood <br />control dam and reservoir only to control the volume of a IOO-year <br />flood. There are 7.6 roiles of dikes and dam in the proposed project. <br />A sIight raise in thc hei~ht of the dam would increase the length of <br />the dlkes out of proportion to the storage gained alld require reloc .... <br />tion of the D~RGW Railroad alignment. <br /> <br />26 The estimGted first cost of a project at this 5itc would be <br />$22,S30,000,allFederal,andthetotlll invescrnent would he $23,SlO,000. <br />Total annual charges would be $1,283,000> Engineering features are <br />listed in Table 16 and" detailed cost estimate is given in Table \7. <br />The plan IS shown on Plate 14. <br /> <br />l-~~ <br /> <br />i <br />I <br />r <br />I <br />! <br /> <br />TABLE 16. -- [nglllcoring reatures, Fountain Creek, Off-strea~ Site <br /> <br />Contributing Drainage Area, square miles <br /> <br />RHEIWOIR, <br />1.lanmurLwatersurface: <br />Eleva.tion, feet <br />Capacity, acre_feet <br />Are.., aCreS <br />,':atersurface at spillwny creSt: <br />Elevation, feet <br />Capacity, acre_feet <br />Area,acres <br />Stora~c allocation: <br />Flo~d control, acre_feet <br />Sedi~ent, a.cre-feet <br /> <br />I <br />I <br />I <br />, <br /> <br />DAN: <br />---:rype <br />Ueightabovestrearobed,feet <br />Top of dam elevation, feet <br />Top of dam width, feet <br />Freeboard,feet <br />Crest length, feet <br />Side slopes: <br />Upstr..anl <br />DownstrealO <br />Embankment sloro <br />Upstream <br />(Jownstrean, <br /> <br />I <br />, <br />I <br />ISPIl,LWi\Y: <br />I Locatioo <br />'>1'0 <br />Maximum design discharGe, <br />[rest e1ev~tion, feet <br />Butto", width, f~~t <br />Side slopes <br /> <br />20'_ <br />20'- <br /> <br />10n2.5; <br />ion2; <br /> <br />protection: <br /> <br />I <br />I <br />I <br />i <br />, <br /> <br />c.f.s. <br /> <br />OUTLET lWRKS: <br />Type <br />Maximum discharge capacity, <br />TerlAi"nlcncrgycuntroJ <br /> <br />c.f.s. <br /> <br />DIVE~SIOl' ~EI~ AKD OIKE: <br />'.'eirlength, feet <br />licight, feet <br />~ndwalls, height. fcet <br />Oge.. ~elr, verticnl siJe~ <br />~l:lx i.,,"", des i g ~ d i s charge, c. f, s. , <br />Ili vcrs ion to re~crvoir <br />Spill H) f"''''tain Crl'''', oof.". <br /> <br />S03 <br /> <br />5187 <br />190,000 <br />4,450 <br /> <br />5182 <br />l6!),OOO <br />3,150 <br /> <br />129,000 <br />40,000 <br /> <br />Earthfill <br />'" <br />5ln <br />20 <br />, <br />15,350 <br /> <br />'" <br />SO' <br /> <br />I on 3; balance _ 1 <br />I On 2.5; balance <br /> <br />on 3.5 <br />lon3 <br /> <br />12" riprapon 6" <br />,.. <br /> <br />gravel <br />spalls <br /> <br />Eastnbutmem <br />Broad crested weir <br />201,500 <br />5182 <br />2,000 <br />10n2.5 <br /> <br />ll'diameter <br />spillway crest <br /> <br />concrete conduit <br />5,000 <br />Stilling basin <br /> <br />1,550 <br />, <br />" <br />Concrete <br /> <br />225,000 <br />200,000 <br /> <br />1-36 <br />