Laserfiche WebLink
<br />TABLES, -- (Cont'd) <br /> <br />Item <br /> <br />Total <br /> <br />ANXUALCflARGtS <br /> <br />cederal .nterost on investment (4~7/8%) <br />Federal amorti:ation of investment (4_7/8%, 100 yr) <br /> <br />53,070 <br />25 , <br />3,095 I <br />! <br />5"' i <br />5 ! <br />m , <br />"05 <br />3,900 <br /> , <br /> I <br /> <br />Total Federal Annual Charges <br /> <br />Non-Federal interest on investment (4-7/8\) <br />Non-Federal amortization of investment (4-7/8%, 100 yr) <br />Operation and maintenance <br /> <br />Totai Non-Federal Ann~al Charges <br /> <br />TOTAL ANNUAL CHARGES <br /> <br />ARKANSAS RI'IER CfiAN!lELlZATION, PUF:BW TO LAS AIIJ.'1AS <br /> <br />15. REVISION OF PRO~ECT PLAII.- Control of FountaIn Creek floods <br />by Fountain R"servoir ~.ould reduce design flows for 100-year protection <br />on the Arkansas River frolJl l'ueblo to the r.louth of Apishapa River. The <br />desicnof the proposed cha"neli:ationproject presented in Appen dix,\ <br />has been revised accordIngly. The principal ch<lngeis the reduction <br />in bottoOl width of the channel from Pueblo to the Apishapa River. The <br />aligTlll\entandgradientshavenotbeenchanged,andthewatersurface <br />profiles remain approximately the same. This reduction in channel <br />capacity substantially reduces the cost of excavation, rights-of-way, <br />and modification of highway and railroad bridges and irrigation diver- <br />sion structures. Except for changes in the design of the project <br />through the ~ Junta urhan are,., which are described in a st1b;~q,,'>nt <br />paragraph, other elements of the revised plan of improvement rcma~n <br />essentially as described in Appendix A. The major revisions in the <br />plan of improvement are tahulated in Tables 6, 7, and 8. <br /> <br />16. LA J~o/TA UREAN AREA.- An e~cavated channel with concrete- <br />lined side slopes, similar in section to other reaches of the Arkansas <br />Rivcr channclizatlon plan, would be constructed through the La Junta <br />reach. The deSIgn discharge with Founuin Reservoir Project ill opera- <br />tiol\\<Iouldbe170,000c.f.s.,whichwouldhavearecurrenceinterva1 <br />of 310 years. TheLaJuntareachrecollllllendedinAppendnA,designed <br />to discharge the standard project flood, conSisted of a concrete-lined <br />channel 800~900 feet WIde, WIthout concrete lining, channel ~idths <br />necessary to pass th,S discharge would result in prohihitive rIght-of- <br />way costs. Further anol.lys>s .ndlc,at~d that an excavol.ted channel with <br /> <br />1-15 <br /> <br />,- <br /> <br />TABLE G. -- Arkansas River Channelization Project <br />Revised Design Discharges <br /> <br /> Appendix A Revised <br /> Channel Chan ,1 <br /> Station Design Base Design Base <br /> " Length flow Width Flow Width <br /> Reol.ch Station mi. c.f.s. H. c.f.s. ,<. <br />fountain Creek to 0+00 <br />SL Charles River 391+85 '" 57,000 .;0 19,000 250 <br />L Charles River 391+85 <br />" Chico Creek 066+00 S.3 73,000 I '00 48,000 '" <br /> I <br />hico Creek to 666~OO , <br />lluerfanoRiver 1030~OO '" 83,000 ;" 64,000 "'0 <br />luerfano River to lO30+ll0 <br />Apishapa River 2018~OO 18.6 90,000 7S0 79,000 050 <br />LaJuntaUroan 5312+00 , <br /> 3425.00 U 200,000 iSOO-900 170,000 1,200 <br /> <br />TAIILE 7. __ Irrigation Diversion Structures - Revised Design <br /> <br /> c:~~nnel <br /> lIase Width (feetl <br />Irrigation Appendi~ A ReVIsed <br />OiversionDam Station Oesin Deain <br />Booth 0.00 '50 250 <br />,xcelsior 281.00 .;0 2;0 <br />oilier . 722.00 700 <br /> "'0 <br />Colorado 838.00 700 650 <br />RockyfordlJighlinc 105S.00 ;SO 6SO <br />xfordFarmcrs 1335+00 ;SO 6SO <br />tero 1716.00 ;SO "" <br /> <br />I-16 <br />