<br />TABLES, -- (Cont'd)
<br />
<br />Item
<br />
<br />Total
<br />
<br />ANXUALCflARGtS
<br />
<br />cederal .nterost on investment (4~7/8%)
<br />Federal amorti:ation of investment (4_7/8%, 100 yr)
<br />
<br />53,070
<br />25 ,
<br />3,095 I
<br />!
<br />5"' i
<br />5 !
<br />m ,
<br />"05
<br />3,900
<br /> ,
<br /> I
<br />
<br />Total Federal Annual Charges
<br />
<br />Non-Federal interest on investment (4-7/8\)
<br />Non-Federal amortization of investment (4-7/8%, 100 yr)
<br />Operation and maintenance
<br />
<br />Totai Non-Federal Ann~al Charges
<br />
<br />TOTAL ANNUAL CHARGES
<br />
<br />ARKANSAS RI'IER CfiAN!lELlZATION, PUF:BW TO LAS AIIJ.'1AS
<br />
<br />15. REVISION OF PRO~ECT PLAII.- Control of FountaIn Creek floods
<br />by Fountain R"servoir ~.ould reduce design flows for 100-year protection
<br />on the Arkansas River frolJl l'ueblo to the r.louth of Apishapa River. The
<br />desicnof the proposed cha"neli:ationproject presented in Appen dix,\
<br />has been revised accordIngly. The principal ch<lngeis the reduction
<br />in bottoOl width of the channel from Pueblo to the Apishapa River. The
<br />aligTlll\entandgradientshavenotbeenchanged,andthewatersurface
<br />profiles remain approximately the same. This reduction in channel
<br />capacity substantially reduces the cost of excavation, rights-of-way,
<br />and modification of highway and railroad bridges and irrigation diver-
<br />sion structures. Except for changes in the design of the project
<br />through the ~ Junta urhan are,., which are described in a st1b;~q,,'>nt
<br />paragraph, other elements of the revised plan of improvement rcma~n
<br />essentially as described in Appendix A. The major revisions in the
<br />plan of improvement are tahulated in Tables 6, 7, and 8.
<br />
<br />16. LA J~o/TA UREAN AREA.- An e~cavated channel with concrete-
<br />lined side slopes, similar in section to other reaches of the Arkansas
<br />Rivcr channclizatlon plan, would be constructed through the La Junta
<br />reach. The deSIgn discharge with Founuin Reservoir Project ill opera-
<br />tiol\\<Iouldbe170,000c.f.s.,whichwouldhavearecurrenceinterva1
<br />of 310 years. TheLaJuntareachrecollllllendedinAppendnA,designed
<br />to discharge the standard project flood, conSisted of a concrete-lined
<br />channel 800~900 feet WIde, WIthout concrete lining, channel ~idths
<br />necessary to pass th,S discharge would result in prohihitive rIght-of-
<br />way costs. Further anol.lys>s .ndlc,at~d that an excavol.ted channel with
<br />
<br />1-15
<br />
<br />,-
<br />
<br />TABLE G. -- Arkansas River Channelization Project
<br />Revised Design Discharges
<br />
<br /> Appendix A Revised
<br /> Channel Chan ,1
<br /> Station Design Base Design Base
<br /> " Length flow Width Flow Width
<br /> Reol.ch Station mi. c.f.s. H. c.f.s. ,<.
<br />fountain Creek to 0+00
<br />SL Charles River 391+85 '" 57,000 .;0 19,000 250
<br />L Charles River 391+85
<br />" Chico Creek 066+00 S.3 73,000 I '00 48,000 '"
<br /> I
<br />hico Creek to 666~OO ,
<br />lluerfanoRiver 1030~OO '" 83,000 ;" 64,000 "'0
<br />luerfano River to lO30+ll0
<br />Apishapa River 2018~OO 18.6 90,000 7S0 79,000 050
<br />LaJuntaUroan 5312+00 ,
<br /> 3425.00 U 200,000 iSOO-900 170,000 1,200
<br />
<br />TAIILE 7. __ Irrigation Diversion Structures - Revised Design
<br />
<br /> c:~~nnel
<br /> lIase Width (feetl
<br />Irrigation Appendi~ A ReVIsed
<br />OiversionDam Station Oesin Deain
<br />Booth 0.00 '50 250
<br />,xcelsior 281.00 .;0 2;0
<br />oilier . 722.00 700
<br /> "'0
<br />Colorado 838.00 700 650
<br />RockyfordlJighlinc 105S.00 ;SO 6SO
<br />xfordFarmcrs 1335+00 ;SO 6SO
<br />tero 1716.00 ;SO ""
<br />
<br />I-16
<br />
|