Laserfiche WebLink
<br />TABtL2, __ {Cont'd) <br /> <br />Federal. <br /> <br /> l~e", Total <br />Federal In.,.~stment Apportionment 1$31,45;.500 <br />~on.Federal Investment Apportio~ent 2.205.500 <br />ANNUAL CHARGES <br />Federal: <br />Interest on investment (4-7/8%) 1,516,190 <br />Amorthation of investment (4_7/8%, 100 years) 13,060 <br />Operation and ~aintenance 99,000 <br />Major replacements 20,350 <br /> Total Federal 1,648,600 <br />~on-Federal: <br />Interest on investment (447/8%) 90,440 <br />Amortization of investment (4-7/8%, 100 years) no <br />Operation and ma.ntenanec Il5.180 <br />Major replacements 21,000 <br /> Total Non-Federal 233,400 <br /> TOTAL ANNUAL CHARGES 1,882,1)00 <br /> <br />OIJerationandMaintenance: <br />Ordlllarylabor <br />Condition and operation studies, instructions,and <br />reports <br />IJtllities,plantrental,and'.quipment <br />Materials and supplies <br />Contingencies <br />Subtotal <br /> <br />Major Replacements: <br />Gates <br />Miscellaneous metal & mechanical & electrical equipment <br />Project-owned equipment <br />Contingencies <br />Subtotal <br />Total Federal <br /> <br />Non-federal: <br /> <br />Operation and Maintenance: <br />Ordinarylahor <br />Utilities,plantrental,andequipment <br />Materials and supplies <br />Contingencies <br />Subtotal <br /> <br />Major Replacements: <br />Recreation facilities <br />Contingencies <br />Subtotal <br /> <br />Total Non-pederal <br /> <br />II'ICludesone-halfof$4,411,OOO,scparableeostofrecreation. <br /> <br />12 UAINT~~ANCE OF FROVZcr,- Maintenance of the project, with <br />the exeept.en of the pemanent pool and recreation facilities, would <br />be the responsibili.ty of the Federal government. TheStateofColo4 <br />raJo would be responsible for acquiring the necessary water rights for <br />estabI.shment and ma.ntenance of the proposed 20.000 acre-foot perma- <br />nent pool, and for operation, maintenance, and replacement of facilities <br />providcdforrecreatlon,fishandw.ldlifeenhaneemcntpurposcs. Peri- <br />odic .nspeetion of all elements with necessary repair. to slopes on the <br />dlWl and spillway and outlet workS would be required. Removalofdebru <br />from the spillway and outlet works channels would be required follow_ng <br />periods of h~gh flows. Continued cleanup and maintenance of the reere. <br />at.on faclllties would be required, particularly during seasons of <br />intensive use. A breakdown of annual cost of operation and maIntenance <br />and major replacements IS shown ~n the following tabulation <br /> <br />TOTAL OPERATION, MAI~TEI\ANCE, ~\JD >1AJOR REPLACEMENTS <br /> <br />ARKJ1NSAS RIVER rWODWAY, BREWSTER TO PLORE.'ICE' <br /> <br />Cost <br /> <br />$56,700 <br /> <br />14,200 <br />5,800 <br />5,800 <br />16,500 <br />99,000 <br /> <br />3,350 <br />3,850 <br />9,750 <br />3,400 <br />20,350 <br />119,350 <br /> <br />77,300 <br />iO,800 <br />i,SIO <br />19,2iO <br />1I5,lSO <br /> <br />22,500 <br />4,500 <br />Zi,OOO <br /> <br />i42,1$0 <br />261,530 <br /> <br />l.3. REVISION OF PROJECT PUN.- It was determined that a minor <br />change in the design of the floodwaywould result ina lowercost,y et <br />provide the Same degree of protection as the original design (IOO.year). <br />InSH'ad llf a double row of Kellner type jetties on the south hank of <br />theimprovedehanne1,theleveeswouldbeproteetedbygrasseovered <br />slol'esandjettioswouldbeplacedonlyatvuInerablelocations. Re- <br />vised engineering features are listed in Table 3, and revised estimated <br />first costs and annual charges are given in Table 4. <br /> <br />1-10 <br /> <br />,." <br />