Laserfiche WebLink
<br />. <br /> <br />g. Complete the construction for the proposed additional <br /> <br /> <br />detention storage in Pond A-B and the new detention pond at <br /> <br /> <br />Dayton Street prior to any diversion of upstream drainage onto <br /> <br /> <br />Lowry Air Force Base; <br /> <br />h. Construct the 72-inch storm sewer along 6th Avenue into <br /> <br /> <br />Kelly Road Dam, as proposed by the city of Aurora; and <br /> <br />1. Provide a storm sewer inlet along lIth Avenue, west of <br /> <br /> <br />Kelly Road Dam, in accordance with the proposed plan for <br /> <br /> <br />downstream channel and drainage improvements. <br /> <br />V. D. STIPO <br />Colonel, Corps of Engineers <br />District Engineer <br /> <br />79 <br /> <br />. <br />