Laserfiche WebLink
<br />. <br /> <br />UPPER LOWRY DAM <br /> <br />A summarized cost estimate for construction of the Upper <br /> <br /> <br />Lowry Dam is shown in table l2. A more detailed cost estimate is <br /> <br /> <br />presented in chapter 3 of the Technical Appendix. <br /> <br />Table 12 <br />Cost Estimate <br />Upper Lowry Dam <br /> <br />First Costs <br /> <br />Direct costs: <br />Relocations <br />Embankments <br />Outlet works <br />Spillway <br />Contingencies <br /> <br />$ 586,000 <br />3,307,000 <br />l64,OOO <br />456,000 <br />l,l28,OOO <br /> <br />$5,64l,000 <br /> <br />Total Direct Cost <br /> <br />Indirect costs: <br />Engineering and design <br />Supervision and administration <br /> <br />508,000 <br />338,000 <br /> <br />Total First Cost <br /> <br />$6,487,000 <br /> <br />Economic value for lands <br /> <br />$3,040,000 <br /> <br />Total Economic Cost <br /> <br />$9,527,000 <br /> <br />Annual Costs <br /> <br />Interest and amortization ~/ <br />Operation, maintenance, and <br />replacement <br />Repair inundation damage to <br />golf course <br /> <br />$ 679,000 <br /> <br />11,000 <br /> <br />Total Annual Cost <br /> <br />2l,OOO <br />$ 711,000 <br /> <br />~/ lOO-year period of analysis at 7.125 percent interest <br /> <br />. <br /> <br />52 <br />