My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03000
CWCB
>
Floodplain Documents
>
Backfile
>
2001-3000
>
FLOOD03000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:26:02 PM
Creation date
10/4/2006 11:23:40 PM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Stream Name
South Platte
Basin
South Platte
Title
Water and Related Land Resources Management Study Volume V - Appendix H
Date
7/14/1980
Prepared For
South Platte and Tributaries
Prepared By
CWCB
Floodplain - Doc Type
Flood Mitigation/Flood Warning/Watershed Restoration
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />MODIFICATIONS TO KELLY ROAD DAM <br /> <br /> <br />A summarized estimate for modifying Kelly Road Dam is shown <br /> <br /> <br />in table 1l. A more detailed cost estimate is presented in <br /> <br /> <br />chapter 3 of the Technical Appendix. <br /> <br />Table 11 <br />Cost Estimate <br />Modifications to Kelly Ro~d Dam <br /> <br />First Costs <br /> <br />Direct costs: <br />Relocations <br />Embankments <br />Outlet works <br />Spillway <br />COntingencies <br /> <br />Interest and amortization ~I <br />Operation, maintenance, and <br />replacement <br /> <br />$ 90,000 <br /> 384,000 <br /> 39,000 <br /> 397,000 <br /> 228,000 <br />$l,138,OOO <br /> l02,OOO <br /> 68,000 <br />$1,308,0001/ <br />$ 445,000 <br />$l,753,OOO 1/ 1 <br />$ 125,000 <br /> 2,000 <br />$ l27,000 <br /> <br />Total Direct Cost <br /> <br />Indirect costs: <br />Engineering and design <br />Supervision and administration <br /> <br />Total First COst <br /> <br />Economic value for lands <br /> <br />Total Economic COst <br /> <br />Annual Costs <br /> <br />Total Annual COst <br /> <br />11 Includes $l,060,000 for emergency measures completed in 1979 <br />II lOO-year period of analysis at 7.125 percent interest <br /> <br />. <br /> <br />5l <br />
The URL can be used to link to this page
Your browser does not support the video tag.