My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03000
CWCB
>
Floodplain Documents
>
Backfile
>
2001-3000
>
FLOOD03000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:26:02 PM
Creation date
10/4/2006 11:23:40 PM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Stream Name
South Platte
Basin
South Platte
Title
Water and Related Land Resources Management Study Volume V - Appendix H
Date
7/14/1980
Prepared For
South Platte and Tributaries
Prepared By
CWCB
Floodplain - Doc Type
Flood Mitigation/Flood Warning/Watershed Restoration
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />Additional storage above this level at Kelly Road Dam would <br /> <br /> <br />require extensive relocation of facilities on Lowry Air Force <br /> <br /> <br />Base; costs of these relocations would be prohibitive. It is, <br /> <br /> <br />therefore, the optimum plan of improvement for Kelly Road Dam <br /> <br /> <br />because it would develop all the feasible storage available at <br /> <br />this site. <br /> <br />The total first cost of the plan that would store the SO-year <br /> <br /> <br />flood would be $6,l73,000; $445,000 of this cost would be for <br /> <br /> <br />lands, $3,6l4,OOO would be construction costs, and $2,ll4,OOO <br /> <br />would be for purchase of lands and buildings immediately down- <br /> <br /> <br />stream from the spillway. The average annual benefits would be <br /> <br /> <br />$l,268,OOO, net benefits would be $826,000 per year, and the <br /> <br /> <br />benefit-cost ratio would be 2.9. Although this plan provides for <br /> <br /> <br />a substantial reduction in average annual damages, floods greater <br /> <br /> <br />in magnitude than the 50-year event would pass through the <br /> <br /> <br />550-foot-wide spillway and floods of major proportions could <br /> <br /> <br />result in catastrophic effects in the densely populated area <br /> <br /> <br />downstream. The peak discharge for the standard project flood, <br /> <br /> <br />as an example, would only be reduced from lO,380 to 9,010 cubic <br /> <br /> <br />feet per second and this discharge would cause approximately $l2 <br /> <br /> <br />million in damages. This plan would, therefore, require acquisi- <br /> <br /> <br />tion of about 80 residential buildings downstream to reduce the <br /> <br /> <br />potential for loss of life and severe property damage. The area <br /> <br /> <br />considered for acquisition, however, includes only that area <br /> <br />where the existing residential buildings would most likely be <br /> <br /> <br />completely demolished by spillway discharges from floods which <br /> <br /> <br />exceed the 50-year event. This acquisition would reduce but not <br /> <br /> <br />remove the potential for loss of life and severe property damage <br /> <br /> <br />could still reach catastrophic levels from major floods. A <br /> <br /> <br />spillway operating frequency of once each 50 years in an area <br /> <br />. <br /> <br />1-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.