Laserfiche WebLink
<br />4, PROPOSED OPEN CHANNEL WI <br />ST. CROSS I NGS IMPROVED 3) <br /> <br />4~ OPEN CHANNEL. 5 YEAR <br />DESIGN FREQUENCY <br />6. DETENTION FACILITY <br /> <br />5, ENLARGE 8ROADWAY CROSSING <br />5. HIGHLINE CANAL FLOW SEP- <br />ARATION STRUCTURE <br />6. HI GHL I NE CANAL TO 3. 5 YEAR REL I EF STORM DRA IN <br />DRAINAGE DIVIDE TOTAL <br />1) ALL ALTERNATES REQUIRE ZONING AND REGULATION <br />BEFORE AND AFTER IMPROVEMENTS. <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />REACH <br /> <br />No,1 <br /> <br />LOCATION <br /> <br />LEE GULCH <br />1. SO. PLATTE RIVER TO <br />ELATI STREET <br /> <br /> LEE GULCH LITTLE CREEK <br /> ALTERNATE REACH REACH <br />NO. DESCRIPTION 1 2 3 1 2 3 4 5 6 <br />1 . FLOOD PLAIN ZONING OF IZZZl IZZZl IZZZI IZZZI IZZZI IZZZI IZZZJ IZZZI lZZZJ <br /> EXISTING FLOOD PLAIN <br />2. NATURAL WATERWAY IZZZ] <br />3. CLOSED CONDU IT (BOX OR IZZZl IZZZI = = <br /> PIPE SECTION) <br />4. OPEN CHANNEL <br /> A) GRASS LINED, 4:1 IZZZl <br /> SIDE SLOPES <br /> B) GRASS LI NED, EUROPE- = <br /> AN <br /> C) RIP RAP LI NED IZZZl 1ZZZ:J <br />5. SELECT ED STRUCTURAL JZZZJ IZZZ1 IZZZZl = <br /> IMPROVEMENTS <br />6. DETENTION FACILITY IUD <br />7. ACQU I S IT I ON OF FLOOD = <br /> PRONE PROPERTY <br />8. NON STRUCTURAL METHODS IZZ7J lZZZl = = IZZZJ = = = <br />9. RELOCATE CHANNEL TO <br /> OTHER THAN HISTORIC <br /> CHANNEL <br /> <br />2. ELATI STREET TO LITTLE- <br />TON CITY L I M ITS <br /> <br />3. L I TT LETON C I TV LI M I TS <br />TO ARAPAHOE COUNTY LINE <br /> <br />LI TTLE CREEK 1) <br /> <br />L SOUTH PLATTE RIVER TO <br />LAKE STREET <br />2. LAKE STREET TO CALEY ST. <br /> <br />3~ CALEY STREET TO GALLUP <br />STREET <br /> <br />3B. GALLUP STREET TO ELATI <br />STREET <br /> <br />4. ELATI STREET TO <br />8ROADWAY <br /> <br />5. BROADWAY TO HIGHLINE <br />CANAL <br /> <br />ALTERNATE <br /> <br />..... ,-,""'" BENEFIT <br />IMr-ROVE,V1LI" <br />COST <br />COST RATIO <br /> <br />AVERAGE <br />ANNUAL <br />COST TO <br />SOCIETY <br /> <br />13 <br /> <br />12 <br /> <br />9 <br />9 <br /> <br />3 <br /> <br />46 <br /> <br />128 <br /> <br />45 <br /> <br />12 <br /> <br />28 <br /> <br />61 <br /> <br />76 <br />76 <br /> <br />22 <br />448 <br />PLAIN <br /> <br />2) FURTHER STUDY NECESSARY TO DETERMINE OPTIMUM LOCATION & SECTION. <br /> <br />3) BENEFIT COST ANALYSIS DOESN'T INCLUDE COST OF STREET IMPROVEMENTS OR FLOOD <br />DAMAGE TO PROPOSED STREET AND CROSSINGS. <br /> <br />azm ALTERNATE SELECTED FOR EVAWATION <br /> <br />FIGURE ]I <br /> <br />MAJOR DRAINAGEWAY PLANNING <br /> <br />LEE GULCH-LITTLE CREE.K <br />URBAN DRAINAGE AND FLOOD CONTROL DISTRICT <br />CITY OF LITTLETON ARAPAHOE COUNTY <br /> <br />ALTERNATE 8 SCREENING MATRIX <br /> <br />K'K'B.N'A Inc" consultif19 Enginee" <br />7456 W. 5th Ave. Denver,Colorado <br /> <br />No.1 <br /> <br />D ESCR'IPTION <br /> <br />ALL COSTS IN THOUSANDS OF DOLLARS <br /> <br />1, FLOOD PLAI N ZON I NG OF <br />EXISTING FLOOD PLAIN <br />5. EROSION PROTECTION AT <br />WINDERMERE ST.&ABAND. <br />1. FLOOD PLAIN ZONING OF <br />EXISTING FLOOD PLAIN <br />5, EROSION PROTECTION AT <br />BROADWAY <br />5. S I DE CHANNEL SP I LLWAY ON <br />HIGHLINE CANAL <br />1. FLOOD PLAIN ZONING OF <br />EXISTING FLOOD PLAIN <br />TOTAL <br /> <br />17 <br /> <br />2.0 <br /> <br />DAM <br /> <br />28 <br /> <br />1.0 <br /> <br />48 <br /> <br />93 <br /> <br />3, CLOSED CONDUIT 100 YEAR <br />DES I GN FREQUENCY 2) <br /> <br />4c, OPEN CHANNEL, 5 YEAR <br />DESIGN FREQUENCY <br /> <br />2. NATURAl WATERWAY <br /> <br />1,762 <br /> <br />6.2 <br /> <br />293 <br /> <br />3.2 <br /> <br />151 <br /> <br />1.4 <br /> <br />26 <br /> <br />0.4 <br /> <br />454 <br /> <br />1.3 <br /> <br />277 <br />102 <br />291 <br /> <br />1.5 <br />5.1 <br />2.5 <br /> <br />184 <br />3,540 <br />OF THE 100 YEAR <br /> <br />1.4 <br /> <br />FLOOD <br /> <br />TABLE m <br /> <br />MAJOR DRAINAGEWAY PLANNING <br />LEE GU LCH - LITTLE CRE E.K <br />U'lBAN DRAINAGE AND FLOOD CONTROL DISTRICT <br />CITY OF LITTLETON ARAPAHOE COUNTY <br /> <br />RECOMMENDED ALTERNATES <br /> <br />KK'BN'A Inc" Consulting Engineers <br />7456 W. 5th Ave, Denver. Colorado ! <br /> <br />-8- <br />