My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD02983
CWCB
>
Floodplain Documents
>
Backfile
>
2001-3000
>
FLOOD02983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:25:59 PM
Creation date
10/4/2006 11:23:23 PM
Metadata
Fields
Template:
Floodplain Documents
County
Arapahoe
Community
Littleton
Stream Name
Lee Gulch, Little Creek
Basin
South Platte
Title
Major Drainageway Planning
Date
9/1/1978
Prepared For
Littleton
Prepared By
UDFCD
Contract/PO #
&&
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br /> <br />TABLE V-B <br /> <br />ESTIMATED COST OF CONSTRUCTION <br />LEE GULCH, REACH 2, ELATI STREET TO LOGAN STREET (EXTENDED) <br /> <br />ITEM <br /> <br />QUANTITY <br /> <br />Side Channel Spillway <br /> <br />1 EA. <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Channel Excavation <br /> <br />500 C.Y. <br /> <br />Drop Structure <br /> <br />1 EA. <br /> <br />Ditch Check <br /> <br />4 EA. <br /> <br />Grouted Riprap <br /> <br />50 C.Y. <br /> <br />Gabion Rundown <br /> <br />100 C.Y. <br /> <br />Concrete Slope Paving <br /> <br />170 C.Y. <br /> <br />Concrete Headwall <br /> <br />10 C.Y. <br /> <br />CDH Type 3 Embankment Protector <br /> <br />1 EA. <br /> <br />Maintenance Access Trail <br /> <br />5,700L.F. <br /> <br />Erosion Check/Trail Crossing <br /> <br />2 EA. <br /> <br />SUBTOTAL <br /> <br />Contingencies (@20%) <br />Engineering (@15%) <br /> <br />I <br /> <br />TOTAL CONSTRUCTION COST <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Fiscal and Aministrative Cost (@8%) <br />Land Acquisition Cost <br /> <br />TOTAL CAPITAL COST <br /> <br />Annual Operation and Maintenance Cost <br /> <br />TABLE V-C <br /> <br />ESTIMATED COST OF CONSTRUCTION <br />LEE GULCH, REACH 3, LOGAN STREET (EXTENDED) TO COUNTY LINE ROAD <br /> <br />COST <br /> <br />ITEM <br /> <br />QUANTITY <br /> <br />$ 32,000 <br /> 2,200 <br /> 17,000 <br /> 8,000 <br /> 2,500 <br /> 8,000 <br /> 26,400 <br /> 3,200 <br /> 1,000 <br /> 17,100 <br /> 1,600 <br />$119,000 <br /> 23,800 <br /> 17,800 <br />$160,600 <br /> 12,800 <br /> - 0 - <br /> <br />Maintenance Access Trail <br /> <br />5,700 L.F. <br /> <br />Erosion Check/Trail Crossing <br /> <br />3 EA. <br /> <br />SUBTOTAL <br /> <br />Contingencies (@20%) <br />Engineering (@15%) <br /> <br />TOTAL CONSTRUCTION COST <br /> <br />Fiscal and Administrative Cost (@8%) <br /> <br />TOTAL CAPITAL COST <br /> <br />Annual Operation and Maintenance Cost <br /> <br />$173,400 <br /> <br />$ 3,000 <br /> <br />COST <br /> <br />$17,100 <br /> <br />2,400 <br />$19,500 <br /> <br />3,900 <br />2,900 <br /> <br />$26,300 <br /> <br />2,100 <br />$28,400 <br /> <br />$ 3,000 <br /> <br />-13- <br />
The URL can be used to link to this page
Your browser does not support the video tag.