Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />LITTLE CREEK: <br /> <br />REACH 1; SOUTH PLATTE RIVER TO LAKE STREET <br /> <br />2. Provide detention facility at Little's Creek Park with a by-pass <br /> <br />conduit having a 2-year capacity. Protect embankment slopes from <br /> <br />erosion failure with buried rip rap or gabions. <br /> <br />1. An open grass lined channel from the South Platte to Santa Fe and <br /> <br />an open channel along the existing alignment and within the existing <br /> <br />right-of-way of Low Avenue from Santa Fe to the railroad that will <br /> <br />be compatible with Littleton's redevelopment concept. <br /> <br />2. A 100-year capacity structure at Santa Fe. <br /> <br />3. Incorporate Littleton's plans for the open area east of the AT & <br /> <br />SF Railroad with a conceptual plan to meter flows out of the pro- <br /> <br />posed detention facility. <br /> <br />4. Relocate the City Ditch in an inverted siphon adjacent to the <br /> <br />railroad embankment. <br /> <br />REACH 5: BROADWAY TO THE HIGHLINE CANAL <br /> <br />REACH 2; LAKE STREET TO CALEY STREET <br />Enlarge all street crossings and the existing channel to convey the <br /> <br />5-year flood, and eliminate the street crossing north of Parkhill <br /> <br />Avenue. Protect the channel from erosion. <br /> <br />1. Enlarge the culvert crossing at Broadway to prevent overtopping of <br /> <br />the street and to remove the upstream buildings from the 100-year <br /> <br />flood plain. <br />2. Protect the existing pond embankments from washing out in the <br /> <br />event of overtopping. <br /> <br />3. Provide a side channel spillway and flow restrictor on the Highline <br /> <br />Canal to spill flood flows out of the canal Grade A swale downstream <br /> <br />of the spillway to avoid flooding any existing structures. Convey <br /> <br />up to 5-year flows underneath the canal to the first pond downstream. <br /> <br />REACH 6; HIGHLINE CANAL TO DRAINAGE DIVIDE <br /> <br />Provide a median channel and cross-over culverts at the existing <br /> <br />channel locations and for the proposed extension of Sterne Parkway <br /> <br />capable of conveying the 5-year flood, eliminating the proposed cross- <br /> <br />ings at Greenwood Street and Lakeview Street. Protect the channel <br /> <br />1. Provide a relief storm drain upstream of the Highline Canal which <br /> <br />would provide, in combination with the existing storm drain, capa- <br /> <br />city for up to 5-year flows. <br /> <br />2. Provide overtopping protection for the detention pond embankment <br /> <br />located at Clarkson Street and Geddes. <br /> <br />3. Investigate improving capacity of storm sewer system at Clarkson <br /> <br />and Geddes. <br /> <br />REACH 3: CALEY STREET TO ELATI STREET <br /> <br />from erosion. <br /> <br />REACH 4, ELATI STREET TO BROADWAY <br /> <br />1. Enlarge all street crossings and the existing channel to convey the <br /> <br />5-year flood. Protect the channel from erosion. <br /> <br />-10- <br />