My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD02939
CWCB
>
Floodplain Documents
>
Backfile
>
2001-3000
>
FLOOD02939
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:25:52 PM
Creation date
10/4/2006 11:21:27 PM
Metadata
Fields
Template:
Floodplain Documents
County
Otero
Basin
Arkansas
Title
Otero County Storm Water Drainage Improvements
Date
2/6/2002
Prepared For
Otero County
Prepared By
Department of Engineering, Land Use and Building
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />, . <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />Colorado Project No. NH 0504-042 <br />SH 50 at Rocky Ford <br />Construction Subaccount No. 13561 <br /> <br />7/2f01 <br /> <br />COLORADO <br />DEPARTMENT OF TRANSPORTATION <br />SPECIAL PROVISIONS <br /> <br />The 1999 Standard Specifications for Road and Bridge Construction, controls construction of this project. The <br />following special provisions supplement or modity the Standard Specifications and take precedence over the <br />Standards Specifications and plans. When specifications or special provisions contain both English units and SI <br />units, the English units apply and are the specification requirements. <br /> <br />PROJECT SPECIAL PROVISIONS <br /> <br />Index Pages <br />Notice to Bidders <br />Commencement and Completion of Work <br />Revision of Section 102-Project Plans and Other Data <br />Revision of Section I 06-Project Testing <br />Revision of Section 206 - Structure Backfill <br />revision of Section 210 - Reset Water Service <br />Revision of Section 403-Hot Bitwninous Pavement <br />Revision of Section 603 - Reinforced Concrete Pipe <br />Revision of Section 630-Retroreflective Sheeting <br />Revision of Section 630- Traffic Cones <br />Force Account Items <br />Utilities <br />Traffic Control Plan-General <br />Special Construction Requirements <br /> <br />July 2, 2001 <br />July 2, 2001 <br />July 2, 2001 <br />July 2, 2001 <br />July 2, 2001 <br />July 2, 2001 <br />July 2, 2001 <br />July 2, 2001 <br />July 2, 200 I <br />July 2, 200 I <br />July 2, 200 I <br />July 2, 200 I <br />July 2, 2001 <br />July 2, 200] <br />July 2, 2001 <br /> <br />Page <br />1.2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9.11 <br />12 <br />13 <br />14 <br />]5 <br />16.17 <br />18-20 <br />2\ <br /> <br />(GOLDENROD PLAN SHEETS FOLLOW SPECIAL PROVISIONSl <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.