Laserfiche WebLink
<br />Figures <br /> <br />4,58 <br /> <br />4.59 <br /> <br />5,1 <br /> <br />Page <br /> <br />Separate Utility Service <br />Tank Foundation""",., .69 <br />Connected Utility Service <br />Tank Foundation , , , , , , , , , ,70 <br />Single Section General <br />Comparison of Material <br />Costs "",."."""",,75 <br /> <br />Figures <br /> <br />5,2 <br /> <br />F,1 <br />F,2 <br /> <br />Page <br /> <br />Double Section General <br />Comparison of Material <br />Costs """"',"""", 75 <br />Design Worksheet, , , , , , , , 103 <br />Design Plan , , , , , , , , , , , , , 105 <br /> <br />LIST OF TABLES <br /> <br />4,1 <br />4.2 <br />4,3 <br />4.4 <br />4,5 <br />4.6 <br />4,7 <br />4.8 <br />4,9 <br />4,10 <br /> <br />4,11 <br /> <br />4.12 <br />4,13 <br />4,14 <br />4.15 <br />4,16 <br />4,17 <br /> <br />4.18 <br /> <br />4,19 <br /> <br />4.20 <br /> <br />4,21 <br /> <br />Lateral Forces , , . , , , '. , , , , ,35 <br />Buoyancy Forces, , , , . , , , , ,36 <br />Drag Forces, , , , , , , , , , , . , ,37 <br />Impact Forces " , , , , , , , , , ,39 <br />Depth of Scour "".,.",,40 <br />Building Loads, , , , , , , , , . , ,41 <br />Building Loads, , . , , , . , , , , ,41 <br />Building Loads, , , , , , . , , , , ,42 <br />Building Loads, , , , , , . , , , , .42 <br />Maximum Vertical Member <br />Load, , , , . , , , , " , , , . , . , , .47 <br /> <br />Minimum Acceptable Pier <br />Designs """""""",50 <br /> <br />Ground Anchor Spacing , , , ,52 <br />Vertical Member Capacity, , .54 <br />ttertical Member Capacity, , ,55 <br /> <br />Vertical Member Capacity, , .56 <br />Vertical Member Capacity, , ,57 <br />Minimum Sawn Lumber <br />Horizontal Beam """"" 60 <br /> <br />Minimum Sawn Timber <br />Cross Bracing """"",,61 <br />Minimum Sawn Timber <br />Cross Bracing ,." , , . , . , , ,62 <br /> <br />Minimum Sawn Timber <br />Bracing at Each End, , , , , , ,62 <br /> <br />Number and Diameter of <br />Bolts at Connection of <br />Horizontal Beams to Square <br />Vertical Members, , , , , , , , , ,63 <br /> <br />4,22 <br /> <br />4.23 <br /> <br />4,24 <br /> <br />4.25 <br /> <br />4,26 <br />4,27 <br /> <br />5.1 <br /> <br />5.2 <br /> <br />5,3 <br />5.4 <br />5.5 <br /> <br />5.6 <br />5,7 <br /> <br />5,8 <br />E,1 <br />E.2 <br /> <br />E.3 <br /> <br />Number and Diameter of <br />Bolts at Connection of <br />Horizontal Beams to Round <br />Vertical Members, , , , , . , , , ,64 <br />Minimum Bolt Spacing <br />Distances Square Vertical <br />Members "."""""",64 <br />Minimum Bolt Spacing <br />Distances Round Vertical <br />Members """"",.",,64 <br />Minimum Nominal Lag <br />Screw Size, , , , , . , , , , , , , , ,65 <br />Bolt Capacity , , , , , , , , . , , , ,66 <br />Diagonal Loading per Foot <br />of Manufactured Home, , , , ,67 <br />Conventional Installation <br />Costs for Single Section , , , ,72 <br />Conventional Installation <br />Costs for Double Section ",72 <br />Earth Fill Costs " , . , , , , , , ,72 <br />Pier Costs """"""",73 <br />Cost per Foot of <br />Manufactured Home , , , , , , ,73 <br />Post and Pile Costs, , , , , , , ,74 <br />Cost per Foot of <br />Manufactured Home, . , , , , ,74 <br />Jacking Costs "",.,.",,74 <br />Vertical Tension, " , ". " , ,99 <br />Minimum Spacing Between <br />Ground Anchors, " , .. . ,,100 <br />Minimum Spacing Between <br />Ground Anchors "",'" ,101 <br />