Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I I <br />I <br />I <br />I I <br />I <br />I <br />I <br />I <br /> <br />ITEM VIII - ESTIMATED COMPLETION PERIOD <br /> <br />Based on our current understanding of the proposed scope of work, we recommend that 6 to 9 <br />months be allocated for completion of the Statewide River Rehabilitation and Floodplain Man- <br />agement Needs Inventory. We have several questions regarding the desired level of effort and <br />deliverables which could affect the project duration. In addition, CWCB may have desired <br />review periods for coordinating with outside agencies which have not been specified in the <br />RFQ. Our Denver Regional Office has the resources and capability to meet any reasonable <br />schedule for the Statewide Needs Inventory. <br /> <br />In response to Item VI in the RFQ, we have prepared a draft schedule for the project based on <br />our current understanding of the scope of work. This is shown on the following page. The <br />overall project duration in this schedule is 7 months. The schedule shows start times and dura- <br />tions of project tasks as listed in the RFQ. The most critical project task from a scheduling <br />standpoint is formulating and distributing a statewide floodplain and river rehabilitation needs <br />survey. This must be accomplished as soon as possible to allow adequate time for follow-up <br /> <br />16 <br /> <br />MONTGOMERY WATSON ~ <br />