My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD02914
CWCB
>
Floodplain Documents
>
Backfile
>
2001-3000
>
FLOOD02914
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:25:49 PM
Creation date
10/4/2006 11:19:55 PM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Basin
Statewide
Title
Statewide River Rehabilitation and Floodplain Management Needs Inventory
Date
8/18/1997
Prepared For
Colorado DNR
Prepared By
Montgomery Watson
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />II <br />I <br />!I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />ITEM VII - CURRENT WORKLOAD/CAPACITY TO <br />COMPLETE THIS PROJECT <br /> <br />This section has been prepared based on current conditions and history in the Denver Regional <br />Office. Information has not been compiled for the 80 other Montgomery Watson offices through- <br />out the world. All of the work for the proposed project will be completed in the Denver Re- <br />gional Office by Denver staff. <br /> <br />CURRENT PROJECTS <br /> <br />The Denver Regional Office currently has 40 active projects under contract. Of these, 19 are in <br />the Water Resources Group which would be responsible for conducting the Statewide Needs <br />Assessment. <br /> <br />The current backlog of the Denver Regional Office is approximately $2.3 million (excluding <br />subcontractor fees). The size of individual projects remaining to be completed ranges from a <br />few hundred dollars to $720,000. The current backlog of the Water Resources Group is $650,000. <br /> <br />Completion dates for existing projects range from September 1997 to 1999. The largest project <br />in the Water Resources Group will be completed by the end of 1997. <br /> <br />LAST FIVE YEARS <br /> <br />During the last five year period, business activity in the Denver Regional Office peaked at <br />about 50 active projects with a total backlog of about $3 million. <br /> <br />ANTICIPATED WORKLOAD <br /> <br />Based on projects for which we have been selected but which are not yet under contract, the <br />largest dollar volume for the Denver Regional Office in the coming year including the State- <br />wide Needs Assessment is approximately $3.4 million. <br /> <br />15 <br /> <br />MONTGOMERYWATSON ~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.