My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD02879
CWCB
>
Floodplain Documents
>
Backfile
>
2001-3000
>
FLOOD02879
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:25:42 PM
Creation date
10/4/2006 11:17:02 PM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Basin
Statewide
Title
Water Project Construction Loan Program
Date
8/1/1994
Prepared By
CWCB
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />g. All required easements shall be shown. <br /> <br />h. Liberal use of detailed blow-ups of all complex connections, junctions, etc. <br /> <br />1. Cross reference to adjacent sheets. <br /> <br />3. The plan and profIle sheets shall be used for all transmission lines or other <br />underground conduits to be constructed and shall show the following as a <br />minimum: <br /> <br />Plan <br /> <br />a. Title block ami revision blocjt. <br /> <br />b. North arrow. <br /> <br />c. Horizontal scale. <br /> <br />d. Alignment (including all necessary stationiJ~g, bearings or angles, and <br />curve data). <br /> <br />e. All valves, stJ1~ctures, and otller appurtenancl~s. <br /> <br />f. All existing utilities (location and identificati.on). <br /> <br />g. All right-of-way lines, easements, and/or other ownership lines, with <br />suitable ties to points of record. <br /> <br />h. Blow-up of areas where more detail is neede,d for clarity. <br /> <br />1. Cross reference to adjacent sheets. <br /> <br />ProfIle <br /> <br />a. Existing growld line over centerline of proposed pipeline. <br /> <br />b. ProfIle of proposed pipelme showing size and type of pipe. <br /> <br />c. Stationing of pipeline and appurtenances to match that on plan view. <br /> <br />d. Vertical scale. <br /> <br />e. All valves, stluctures, etc. <br /> <br />f. Cross reference to adjacent :;heets. <br /> <br />E-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.