Laserfiche WebLink
<br />APPENDIX E <br /> <br />GUIDELINES FOR PREPARATION OF PLANS AND SPECIFICATIONS <br /> <br />A. Plans <br /> <br />All plans for projects which are being fmanced by the Colorado Water Conservation <br />Board Construction Fund shall be submitted to the CWCB staff for review to verify compliance <br />with the contract and the guidelines prior to the advertisement for bid on the projects. It is <br />recommended that the engineer review these guidelines for plan preparation and the guidelines <br />for specifications with the CWCB staff prior to the initiation of detailed design work. <br /> <br />The project plans must be prepared by an engineer registered in Colorado, and they shall <br />consist of a title sheet and as many plan only and plan and profile sheets as are necessary to <br />properly show the work to be done. The plans shall be prepared in sufficient detail to allow a <br />qua1ified contractor to construct the project facilities from them. <br /> <br />1. The title sheet shall show the following items as a minimum: <br /> <br />a. Project title. <br /> <br />b. Engineer's stamp and signature. <br /> <br />c. Location map. <br /> <br />d. Vicinity map. <br /> <br />e. All general notes which the engineer feels are applicable to the project. <br /> <br />2. The plan only sheets shall show the following as a minimum: <br /> <br />a. Plan view of all required site grading. <br /> <br />b. Plan view of all dams, buildings, structures, etc., with adequate sectional <br />or elevation views. <br /> <br />c. On all sectional views, it is important that the original ground line be <br />shown, as well as the proposed grade lines. <br /> <br />d. Title block and revision block. <br /> <br />e. Scale. <br /> <br />f. North arrow. <br /> <br />E-l <br />