Laserfiche WebLink
<br />1.2 Use of these Guidelines <br /> <br />The Guidelines are not intended as a set of inflexible rules but instead are offered for the <br />assistance of project sponsors and their consultants in planning, designing and constructing the <br />most cost-effective projects for the maximum berefit of Colorado water users. Project sponsors <br />and their consultants are encouraged to discuss any questions they may have regarding the <br />process or procedures outlined here with the CWCB staff. <br /> <br />Chapters 2 through 4 of these Guidelines deal with the preparation of planning studies. <br />General guidelines for the preparalion of all planlling studies are pre:sented in Chapter 2. More <br />specific guidelines for reconnaissance studies and feasibility studies are found in Chapters 3 and <br />4 which were written for use by the consultants responsible for the preparation of the studies. <br /> <br />A reconnaissance study is generally conducted to obtain :m overview of water resource <br />opportunities or problems for a particular study ~Iea. The reconnaissance study usually results <br />in the identification of several conceptual alternatives which are evaluated at a preliminary level <br />of detail. The reconnaissance study may precede the feasibility study for a particular project. <br /> <br />A feasibility study is a more detailed analysis of a limited number of alternatives or of <br />one selected alternative. The great majority of planning studie:s prepared for review by the <br />CWCB are feasibility studies. <br /> <br />Mter the planning study has been completed and a project is recommended by the CWCB <br />and authorized by the General Assembly, design and construction will begin. Chapter 5 provides <br />a discussion of design and consuuction administration for projects funded from the CWCB <br />Construction Fund. <br /> <br />The following appendices are to be found following Chapter 5 of these Guidelines: <br /> <br />Appendix A - Construction Fund Loan Application <br />Appendix B - Use of Evaluation Factors for Planning Studies <br />Appendix C - Repo11 Writing Guidelines <br />Appendix D - Water Project Perm::tting <br />Appendix E - Guidelines for Plans and Specifications <br />Appendix F - Pre-Construction Conference Checklist <br />Appendix G - Monthly Payment Estimate <br />Appendix H - Annual Payments and Total Interest for a $100,000 Loan <br /> <br />2 <br />