Laserfiche WebLink
<br />. i _.. <br /> <br />-, <br /> <br />. <br /> <br />. <br /> <br />SGOpe of Work <br />1998 State of Colorado Hazard Mitigation Plan - 409 <br />In response to <br />DR-1186-CO - Flood Disaster in Colorado <br />DeGlared August 1,1997 <br /> <br />Background: <br />Flood mitigation has been occurring in CoIol1ldo for several decades. The first Colorado <br />Flood MltigatiOl'l plan _ organized lIl1d lfev8IOS)ed follOWIng the l.awrl Lake Flood <br />disaster of 1982. During 1984, 17 counties on the western Slope auffered rnudsficles <br />and flooding and a reviliion to the 1982 plBn was COmpleted. In 1993, mountain <br />anawpack WllS at an al!-time high In several drainages. During these period state <br />agencies In concert with local gowmmenls complelecl pre-disaster mitigation projec:ts, <br />which mitigatecl the effectll of the ftoocIing. <br /> <br />Scope: <br />. This 1998 revision to the January 1985 Flood Hazard Mitigation Plan will update <br />flood events Illstork;al to present <br /> <br />. Incorporate the Issues and recommendations of the 1997 Interagency Hazard <br />Mitigation Team mel'T\ber$ that are intended to help achieve the goal of reducing <br />future flood events. <br /> <br />. Review all fIooc:I mitigation plans eomplatsd at the private, local, 5tate federal levels <br />and incorporate appropriate items into the 1998 Flood Hazard MitigatIon plan. <br /> <br />MitigatiDn Plan Outline: <br />1. Prelrninsies <br />2. IntrodudiOl'l <br />3. Hazard IdentifiCation and EwIuation <br />4. Capabilily Assessment <br />5. Proposed Mitigation AdIvIIkIs <br />e. Plan Implementation and Maimeilance <br /> <br />Mitigation Plan Checklist for Consultant: <br /> <br />1. Has the Stale ~ Plan been appfowd? If yes. place the date of approval <br />in the comment field (208.403. 206.405). <br /> <br />2. Does the State MItIgaIIon PI8n haw apprwal dates otherthan the original1lf <br />yes. pia<>> the Ialest appllMll date in the c:.omment tieJcl (206.405 (a) (4)). <br /> <br />3. Was the plan required to be UI-1-1..,.j as a condition of the previo\l$ declaration? <br />If yes. place the due d8te for the update in the comments fleId (206.403 (1,)(2). <br />206.405(cI)}. <br /> <br />1 <br />