My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD02638
CWCB
>
Floodplain Documents
>
Backfile
>
2001-3000
>
FLOOD02638
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:25:01 PM
Creation date
10/4/2006 11:01:59 PM
Metadata
Fields
Template:
Floodplain Documents
County
Montrose
Community
Montrose
Stream Name
Uncompahgre River
Basin
Gunnison
Title
Montrose Flood Control and Drainage Plan
Date
3/1/1981
Prepared For
Montrose
Prepared By
Gingery Associates, Inc.
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />EXECUTIVE SU~!t1~RY <br /> <br />This report presents a plan to reduce flood damage in the City of <br /> <br /> <br />Nontrose. At the present time the culvert crossings on Nontrose Arroyo <br /> <br />are insufficient to pass the lOa-year flow; consequently, during such an <br /> <br />event a considerable amount of flow would be lost from the channel to <br /> <br />flow overland. This shallow flooding would flow away from r~ontrose Arroyo <br /> <br />west and northwest toward the Uncompahgre River, resulting -in average <br /> <br />annua-I damages to residential and commercial areas in the amount of <br /> <br />$198,000. There is also some overflow from Cedar Creek in f'lbntrose due <br /> <br />to insufficient culvert capacity, which causes $24,000 in average annual <br /> <br />damages. The recommended Flood Control Plan consists of -improving ten <br />cu-Iverts on f'lbntrose Arroyo and one on Cedar Creek. This plan would el imi- <br /> <br />nate structural damage from noods up to th'2 -lOa-year event. The economic <br /> <br />evaluation was completed based on the following criteria: 7 3/8% interest <br /> <br />rate; project life of 50 years; <br /> <br /> <br />sis yields benefit-cost ratio~s <br /> <br /> <br />Cedar Creek respectively. <br /> <br />and 1980 donar base. This economic analy- <br />I ,:tIll ? . 4"1 <br />of J.n- and 3.63- for Nontrose Arroyo ilnd <br /> <br />- 3 . <br />
The URL can be used to link to this page
Your browser does not support the video tag.