My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD02638
CWCB
>
Floodplain Documents
>
Backfile
>
2001-3000
>
FLOOD02638
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:25:01 PM
Creation date
10/4/2006 11:01:59 PM
Metadata
Fields
Template:
Floodplain Documents
County
Montrose
Community
Montrose
Stream Name
Uncompahgre River
Basin
Gunnison
Title
Montrose Flood Control and Drainage Plan
Date
3/1/1981
Prepared For
Montrose
Prepared By
Gingery Associates, Inc.
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Improvements on Montrose Arroyo should be started in the downstr'eam <br />areas first, then proceed upstream, The on'ly exception to this downstream <br />to upstream schedule is the culvert at South 8th Street which requires <br />only an improved inlet and, therefore, has a lower replacement priority. <br />Of course, it may be necessary to deviat.e s'l ight.ly from this schedule <br />because of the deteriorated condition of some of the existing culverts. <br />The fl oodp 1 ai n management program recommened for Dry Cedar Creek shou1 d <br />be started as soon as possible to prevent a future increase in flood damage. <br /> <br />- 33 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.