My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD02638
CWCB
>
Floodplain Documents
>
Backfile
>
2001-3000
>
FLOOD02638
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:25:01 PM
Creation date
10/4/2006 11:01:59 PM
Metadata
Fields
Template:
Floodplain Documents
County
Montrose
Community
Montrose
Stream Name
Uncompahgre River
Basin
Gunnison
Title
Montrose Flood Control and Drainage Plan
Date
3/1/1981
Prepared For
Montrose
Prepared By
Gingery Associates, Inc.
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Plan Implementation <br />Operation and maintenance is an important part of any flood control <br /> <br />plan. Structures must be repaired as necessary and be kept free of debris <br /> <br />to insure that facilities function properly when flood events do occur. <br /> <br /> <br />The selected Flood Control Plan should require less maintenance than the <br /> <br />existing system because the proposed structures are less likely to block <br /> <br />with debris. <br /> <br />One of the advantages of the selected Plan is that it can be con- <br /> <br /> <br />structed in stages. In order to provide the greatest degree of flood <br /> <br />ov;:JI.9JV <br />protection in the least time, the following construction 'Sci1etftrl'e should <br /> <br />be followed: <br /> <br />1) Hi 11 crest Street - Ceda r Cree k <br />2) North 7th Street - Montrose Arroyo <br />3) Main Street - Montrose Arroyo <br />I~ ) South 1st Street - Montrose Arroyo <br />,) South 4th Street Montrose Arroyo <br />" <br />6) South 5th Street - Montrose Arroyo <br />7) South 6th Street - Montrose Arroyo <br />8) South 7th Street - Montrose Arroyo <br />9) South 9th Street - Montrose Arroyo <br />10) South 12th Street - Montrose Arroyo <br />11) South 8th Street - Montrose Arroyo <br /> <br />This schedule calls for the culvert on Cedar Creek to be constructed <br /> <br />first. When this one crossing is completed, 100-year flood damage along <br /> <br />Cedar Creek will be eliminated, including the Gibson's Shopping Center, <br /> <br />- 32 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.