Laserfiche WebLink
<br />GREENHOUSE HIT HARD BY R'UN- OFF <br />WATERS DURING HAIL STORM <br /> <br />About eight inches of <br />water was running through <br />the main office of the <br />greenhouse. . . (\ <br />About three \ b!ml's after <br />the storm hit,~ 6: 30 p.m., <br />there was still about four <br />inches of runoff water <br />going down the cUTb in <br />front of the greenhouse. <br />"Two conditions made it <br />bad where we are located. <br />All the surface water from <br />upper South Townsend Ave. <br />naturally runs in this <br />direction. " <br />"Another condition prevents <br />the runoff surface water <br />from traveling its normal <br />course is the fact that much <br />land on the south 0 f the <br />road at the river bridge, <br />outside the city limits, has <br />been filled in. And this <br />makes the water back up." <br /> <br />6-21-67 <br /> <br />, <br />'(\ <br /> <br />- 15 - <br />