My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD02559
CWCB
>
Floodplain Documents
>
Backfile
>
2001-3000
>
FLOOD02559
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:24:47 PM
Creation date
10/4/2006 10:58:52 PM
Metadata
Fields
Template:
Floodplain Documents
County
Gilpin
Community
Black Hawk
Basin
South Platte
Title
Black Hawk Chunnel Technical Information
Date
2/3/1995
Prepared For
Black Hawk
Prepared By
Futura Engineering Inc
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> I' <br /> Page 8 <br /> 1 Chunnel Committee <br /> December 2, 1994 <br /> I Item <br /> No. <br /> 1 1. Mapping update $8,000 <br /> I 2. Geotechnical investigation and report for chunnel/low flow channel $13,000 <br />I <br />i 3. Chunnel construction plans - preliminary $80,000 <br />I <br /> I horizontal and vertical alignment, plan/profiles & cross to <br /> sections $120,000 <br /> details and typical sections - local drainage connections, Black depending <br /> I Hawk Street/Gregory Gulch connection, special manholes, on review <br /> inlets, etc. require- <br /> transition structure, including undergrounding of Caldwell ments <br /> I pump house <br /> outlet structure <br /> specifications and contract documents for construction access, <br /> ~ water control, earthwork, concrete, other materials, etc. <br /> design report <br /> 4. Utility design/coordination $15,000 <br /> I <br /> S. Coordination meetings with "dirty" water pipe designer $5,000 <br /> I 6. Low flow channel design $30,000 <br /> horizontal and vertical alignment <br /> landscaping, boulder placement, timber or rock checks, <br /> I revetment, local drainage <br /> 7. Right-of-way/ownership mapping $20,000 <br />. <br /> I 8. Coordination with Black Hawk project manager, U.S. Army Corps of $8,000 <br /> Engineers, U.S. E.P.A., State Historic Preservation Office, Colorado <br /> I Water Conservation Board. <br /> 9. Floodplain submittal for Qty of Black Hawk to Federal Emergency $5,000 <br /> Management Agency for re-designation of the floodplain boundary <br /> I and changes to the floodplain mapping (either letter of map revision <br /> or physical map revision) <br /> I 10. Additional F.E.M.A. submittals/interaction T&M <br /> This task is difficult to predict. Re-submittals may be simple <br /> or extensive. Time and material billing is suggested with a <br /> I range from $2,000 to $10,000. <br /> I <br /> I <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.